# Strip It Out Demolition | Full Content > Professional strip out and internal demolition services on the Gold Coast and Brisbane. Kitchen, bathroom, commercial & residential strip outs. > Service area: Gold Coast, Brisbane, and everywhere in between (~60km radius) > Phone: 0430 030 633 | Email: info@stripitout.com.au > Website: https://stripitout.com.au ## Services (16) ### Commercial Strip Outs & Defits in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/commercial-strip-out Complete office, retail, and hospitality strip outs. We deliver a clean blank canvas for your next commercial project. A commercial strip out is the complete internal demolition of a commercial space, stripping every non-structural wall, ceiling, floor covering, shopfitting and service back to a bare, blank shell. Strip It Out delivers commercial strip outs and defits across the Gold Coast and Brisbane for offices, retail tenancies, hospitality venues and medical suites, handing you a clean canvas for the next fitout or a compliant make-good for handover. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. Our scope covers the full interior: non-structural walls and partitions, suspended ceilings and grid systems, carpet, vinyl and tiled flooring, joinery and shopfittings, signage, and redundant lighting, plumbing and electrical fixtures. We work to whatever the project or lease demands, from a light defit through to a full strip back to base building, and every job begins with a fixed-scope written quote. Where the slab needs it afterwards, we [grind the floor](/services/concrete-grinding) ready for new coverings, and all [demolition waste and debris is removed](/services/rubbish-debris-removal) and disposed of responsibly. # How long a commercial strip out takes A small office or retail strip out is often completed in one to three days. Larger tenancies, multi-level fitouts and full base-building strips take longer and are usually staged around your handover date or the incoming fitout team's program. We schedule tightly, including nights and weekends, so the strip out never holds up a lease deadline. We handle commercial strip outs across every sector: office strip outs and [partition removal](/services/wall-partition-removal), retail and shopfront defits, cafes, restaurants and bars, and medical, dental and professional suites. For end-of-lease make-good work, our dedicated [shop and office defit](/services/shop-office-strip-out) service returns a tenancy to its required condition, while large sites are covered by our [warehouse and industrial strip out](/services/warehouse-industrial-strip-out) service. As a fully licensed and insured, family-owned team operating for more than seven years, we work to Queensland workplace health, safety and environmental standards on every site. From a single Gold Coast office to a multi-tenancy Brisbane building, we deliver a tidy, trade-ready handover on time and on budget. Call Strip It Out for a free, fixed-scope quote. # What Affects the Cost of a Commercial Strip Out? Commercial defit and strip out pricing is scoped line-by-line against your make-good clause or fit-out plan. The main cost drivers: - **Floor area and fit-out density** - partitions, ceilings, joinery and services all add scope. - **Make-good requirements** - returning to base building condition costs more than a partial defit; we scope directly off your lease clause. - **Building access and hours** - centre management rules, after-hours work windows, lift access and loading dock logistics all affect labour planning. - **Services isolation** - electrical, mechanical, fire and data must be isolated and certified before works. - **Waste streams** - sorted recycling of metals, plasterboard and timber keeps disposal costs down; we provide waste dockets for handover. - **Program** - compressed timelines needing night or weekend crews price differently to standard hours. Read [what soft strip demolition includes](/blog/what-is-soft-strip-demolition) and our [strip out cost guide](/blog/how-much-does-a-strip-out-cost), or [request a site walk-through and fixed quote](/contact). **Includes:** - Interior demolition: walls, partitions, ceilings, flooring and fixtures - Floor removal: carpet, tiles, vinyl and timber - Ceiling removal: suspended ceilings, grid systems and fixtures - Wall removal: non-structural walls and partitions - Fixture removal: lighting, plumbing and kitchen equipment - Complete rubbish removal and site cleanup ### Internal Strip Out & Demolition in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/internal-strip-out The umbrella service that covers every internal strip out and internal demolition we do — commercial defits, residential strip outs, tile and floor removal, asbestos coordination and silica-compliant dust control across the Gold Coast and Brisbane. An internal strip out is the systematic removal of all non-structural elements from inside a building — partitions, ceilings, floor coverings, fixtures, joinery and fit-out services — while the structural shell (load-bearing walls, columns, slab and roof) stays untouched. It's the first stage of nearly every commercial defit, residential renovation and pre-demolition project, and Strip It Out delivers it across the Gold Coast and Brisbane. Two things to know up front. First, internal strip out is not "building maintenance" or casual renovation prep in the regulatory sense — under BS 6187 (the international Code of Practice for Full and Partial Demolition) and Queensland's WHS framework, it is **classified as demolition work** and carries the corresponding safety, licensing and notification obligations. Second, since 1 September 2024 the rules around crystalline silica dust — which strip outs generate in volume — have tightened materially. The contractors worth hiring now are the ones who actually run the work to those rules. # What's included in an internal strip out A typical internal strip out clears out everything inside the structural shell: - Non-structural partition walls (timber stud, steel stud, lightweight masonry) - Suspended ceilings, bulkheads and ceiling-mounted services - Floor coverings (tiles, carpet, vinyl, timber) plus the screed and adhesive beneath - Joinery: built-in cabinetry, benchtops, shopfront, reception desks, storage - Fixtures and fittings: lighting, plumbing fixtures, sanitaryware, switchboards - Mechanical fit-out: ducting, grilles, fan-coil units (mains isolated by a licensed mechanical trade first) - Electrical fit-out: data cabling, conduit, GPOs, fittings (mains isolated by a licensed electrician first) - Plumbing rough-in: pipe sections penetrating non-structural elements (mains isolated by a licensed plumber first) - Signage, branding, display systems and window treatments - Sorting and removal of all waste materials ## What's not included The structural shell stays: - Load-bearing walls, columns and beams - Concrete slab and footings - External walls, cladding and roof structure - Utility mains (power, gas, water, fire services) — these are **isolated at source** by the relevant licensed trades before strip-out begins; never disconnected ad-hoc by the demolition crew If a wall is load-bearing and needs to come out, that is a separate scope — it needs an engineer, possibly a builder, and possibly a council building permit. We will flag that during inspection rather than touch it. # Internal strip out vs full demolition, soft strip, defit and make-good The terms get used interchangeably. The actual landscape: - **Internal strip out** = removal of non-structural fit-out, leaving the shell. Also called *interior demolition* or *interior strip-out*. - **Soft strip / soft strip demolition** = the same thing — the term used by architects and project managers. UK construction calls it soft strip; Australian commercial property tends to say strip out or defit. - **Full demolition** (hard demolition) = removal of the entire building including structural elements. Requires a separate WorkSafe Queensland demolition work licence, engineering, hoarding and a council demolition permit. A strip out often *precedes* a full demolition (to enable salvage and waste separation). - **Defit** = a strip out conducted at the **end of a commercial lease**, scoped to the lease's make-good clause. All defits are strip outs; not all strip outs are defits. - **Make-good** = the *legal obligation* in the lease describing the condition the tenancy must be returned in. The defit is the *activity* that achieves the make-good. - **Dilapidation** = a *condition report* (photographic and written) documenting the building's state before works begin. Not an activity — a risk-management document. Strongly recommended for strata, semi-detached and shared-wall buildings. # When you need an internal strip out There are four reliable triggers: 1. **Pre-renovation** — clearing fit-out so a builder can install a new kitchen, bathroom or full interior. Most residential strip outs sit here. 2. **End-of-lease defit / make-good** — restoring a commercial tenancy to its lease-required handover condition. Driven by lease dates, often with after-hours scheduling and centre-management coordination. 3. **Pre-full-demolition** — soft-stripping interiors before structural demolition, both for safety (removing combustible and hazardous materials) and for material-recovery economics. 4. **Pre-sale clearance** — clearing a property of fit-out to present a neutral, marketable shell to potential buyers. If your project is one of these, an internal strip out is the scope. # Queensland regulatory checklist for internal demolition This is the section most contractors skip — and it's exactly the section commercial property managers, builders and procurement people screenshot. Here is what governs internal strip-out work in Queensland in 2026: - **QBCC contractor licence** — required for any building work in Queensland valued **over $3,300** (including labour and materials). Internal strip-out work is building work under the QBCC Act, so a current QBCC licence of the appropriate class is required. Verify your contractor at the QBCC's "Find a Local Contractor" tool. - **WorkSafe Queensland demolition work licence** — required separately where work involves load-shifting equipment (excavators, skid-steers), pre-tensioned or post-tensioned structural components, or explosives. Pure interior soft strip by hand tools usually does not trigger this licence, but the PCBU still has full WHS Act duties. - **5-day WHSQ notification** — required before commencing notifiable demolition (such as demolition of structural elements over 6 m). For interior-only strip outs this generally does not apply, but a competent contractor confirms it case by case. - **Safe Work Method Statement (SWMS)** — required under WHS Regulation 2011 for all high-risk construction work, which includes work involving asbestos, demolition of load-bearing elements and crystalline silica processing. Every Strip It Out job has a SWMS prepared and on site. - **Asbestos pre-demolition rule (WHS Reg s.452–453)** — asbestos must be removed before demolition commences "so far as reasonably practicable", which means a refurbishment/demolition asbestos survey is required for any pre-1990 building. - **Council permit / development approval** — pure non-structural interior strip-outs in commercial tenancies in Brisbane and the Gold Coast typically do not require a DA or building permit. They do when: structural walls are touched, the building is heritage-listed or overlaid, the project precedes full demolition, or essential safety measures (sprinklers, alarms) are affected. Confirm with the relevant council or an accredited building certifier before scope is finalised. The two foundational regulatory documents are **Safe Work Australia's Model Code of Practice — Demolition Work** (adopted in Queensland as the WHSQ Demolition Work Code of Practice 2021) and the **WHS Regulation 2011**. # Silica compliance — what changed in 2024 Crystalline silica is the dust that strip outs generate when you remove tiles, concrete, brick, fibre-cement sheeting and engineered stone — all common in Australian buildings. Breathed in, the fine fraction (respirable crystalline silica) causes silicosis, lung cancer and COPD. Australia tightened the rules in two waves: - **1 July 2024** — Australia became the first country to ban the manufacture, supply, processing and installation of engineered stone benchtops, panels and slabs, in response to the silicosis epidemic among stonemasons. - **1 September 2024** — stronger nationwide rules took effect for **all crystalline silica work**, not just engineered stone. A **crystalline silica substance (CSS)** is any material containing **at least 1% crystalline silica by weight** — covering concrete, mortar, fibre-cement, tiles, grout and most natural stone. Before any *high-risk crystalline silica work*, the PCBU must conduct a documented risk assessment and prepare a **written Crystalline Silica Risk Control Plan**. Uncontrolled dry cutting is effectively banned — water suppression or on-tool extraction with H-class HEPA vacuums is mandatory. Minimum RPE for high-risk processing is P3 / FFP3, escalating to powered air-purifying respirator (PAPR / TH3) for sustained work. - **1 October 2025** — the new **Silica Worker Register** commenced. Workers undertaking high-risk silica processing must be notified to the register within 28 days of starting. What this means in practice: a contractor who turns up to grind a tiled floor with an angle grinder and no extraction is working *unlawfully*. Strip It Out runs water suppression, on-tool HEPA extraction and proper RPE on every silica-relevant job — both because it's the law and because it's the right thing for everyone on site. For a homeowner-focused walkthrough of what silica dust is and how to spot a contractor who handles it properly, see our [silica dust and home renovations guide](/blog/silica-dust-home-renovations). # Asbestos in pre-1990 buildings Asbestos was widely used in Australian construction until the late 1980s and was fully banned from new use in 2003. Buildings constructed before late 1987 should be treated as potentially containing asbestos until proven otherwise — and in practice, that extends through anything completed before about 1990. The Queensland rules: - **Refurbishment/demolition asbestos survey** by a competent person is required before any strip-out work that may disturb materials in a pre-1990 building. The survey identifies the location, type and condition of any asbestos-containing materials (ACM). - **Up to 10 m² of non-friable (bonded) ACM** can be removed by an unlicensed person following safe-work procedures. In a residential owner-occupier context only, a Queensland Health homeowner's certificate is required for DIY removal of more than 10 m² of bonded ACM. - **More than 10 m² of non-friable ACM** must be removed by a business holding a current **Class B or Class A asbestos removal licence**. - **Any amount of friable (loose/damaged) asbestos** must be removed by a **Class A licensed removalist only**, regardless of quantity. **Commercial strip-out contractors are not the homeowner.** The 10 m² DIY allowance does not apply on commercial jobs. Any commercial strip-out in a pre-1990 building must be assessed for ACM before quotation and priced to include licensed asbestos removal if found. Reputable contractors pause and refer to a Class A or B asbestos removalist rather than disturb suspect material. # Our internal strip-out process Every Strip It Out job runs the same disciplined sequence: 1. **Site inspection and quote.** We visit the site, identify hazards (especially asbestos and existing services), scope inclusions in writing, and provide a fixed-scope quote. No vague "TBC" line items. 2. **Pre-start checks.** Asbestos survey if required; service isolation booked with licensed electrician, plumber and (if relevant) gas fitter; SWMS prepared; dilapidation report agreed if neighbours or shared structure are at risk. 3. **Mobilisation.** Site protection (floor protection, dust barriers, lift booking, loading-zone permits), RPE issued, signage posted, neighbours and adjacent tenants informed. 4. **Top-down removal.** Ceilings and high services first, then walls and partitions, then floor coverings and substrates. This sequence keeps the work area cleaner and safer at every stage. 5. **Dust and silica control.** Water suppression at the source, on-tool H-class HEPA extraction, sealed work zones, P3 / PAPR RPE — we work to the HSE *Assess, Control, Review* framework adapted to the WHSQ Crystalline Silica Code of Practice 2022. 6. **Sorted waste handling.** Materials are separated at source where practical — metals, recoverable timber, clean concrete and salvageable fixtures from general waste. This reduces landfill cost and is genuinely better for the planet. 7. **Final clean and hand-over.** HEPA-vacuumed, not dry-swept. Inspection, sign-off, photographs. The space is trade-ready for the next contractor. # What drives the cost — and how long it takes We don't publish dollar figures here because every strip out is priced to its specific scope, and an honest fixed quote beats a misleading price band. The factors that move the quote, in roughly the order they matter: - **Floor area** — the primary scale driver, especially in commercial work. - **Scope depth** — fixture-only is a different job to full ceiling/wall/floor removal plus substrate preparation. - **Tile bed and substrate** — tiles on a thick sand-and-cement bed take far longer to remove than thin-set tile, and the substrate usually needs grinding afterwards. - **Access** — ground floor with truck access is straightforward; high-rise with lift bookings, restricted loading windows or after-hours requirements adds time and cost. - **Hazardous materials** — asbestos, lead paint or contaminated materials add survey, licensed-removal and regulated-disposal cost. This is the single biggest cost escalator in pre-1990 buildings. - **Service isolation** — formally isolating mechanical, electrical and plumbing services through the relevant licensed trades is sometimes additional to the strip-out price. - **Waste volume and type** — disposal is a real cost and rises with volume. Queensland's Waste Levy applies to commercial waste — on-site separation can offset some of this. Typical timeframes by job type: - **Single-room residential** (kitchen or bathroom): 1–2 days on site - **Full residential or pre-renovation strip out:** 3–7 days on site - **Small commercial defit** (up to ~200 m²): 3–7 days on site - **Mid-size commercial defit** (200–1,000 m²): 1–3 weeks on site - **Large commercial defit or full floor plate** (1,000 m²+): 3–6 weeks on site Lead time before mobilisation (asbestos survey, service isolation, SWMS, council notification if applicable) typically adds 1–2 weeks regardless of project size. For a more detailed walk-through of cost factors — same factor-based framing, no invented prices — see our [strip-out cost guide](/blog/how-much-does-a-strip-out-cost). # Material salvage and responsible waste Internal strip outs generate significant waste — but most of it is recoverable. Construction and demolition waste is the **single largest waste category in Australia**, representing **39% of the national waste stream** (29.2 million tonnes in 2022-23, per the federal government's DCCEEW National Waste Report 2024). The good news: Australia's national C&D recovery rate is **84%**. Metals, clean concrete, recoverable timber and many fittings can be diverted from landfill. Why this matters commercially as well as environmentally: in Queensland the **Waste Levy** applies to commercial waste going to landfill, so the more material we recover, the more we reduce your disposal cost. We sort metals, recoverable joinery and clean concrete on-site where the job size makes it practical. It's the right way to run a strip out and it is frequently the cheaper way too. # How to vet a strip-out contractor in Queensland Before you sign with any internal demolition contractor, check these eight things. It takes ten minutes and it's the difference between a clean handover and a six-month dispute. 1. **Valid QBCC contractor licence** of the appropriate class. Verify it by name at the QBCC's "Find a Local Contractor" tool. If they can't give you their licence number on request, walk away. 2. **WHSQ demolition work licence** if applicable to the scope. 3. **Public liability insurance** — minimum $20 million is standard for commercial sites. 4. **Workers' compensation cover** — required for any business with employees in Queensland. 5. **Asbestos removal licence (Class A or B)** if they're proposing to remove asbestos themselves, OR a stated process for engaging a licensed removalist if any is found. 6. **A Safe Work Method Statement** provided before work starts — not as an afterthought. 7. **References and a project portfolio** with at least two or three jobs of comparable scope. 8. **A written, fixed-scope quote** that itemises what's included, what's not included, the timeframe and the waste-removal arrangement. Vague "POA" or "to be quoted" line items are red flags. Strip It Out is QBCC-licensed and insured. We provide all of the above as standard with every quote. # Internal strip-out services we cover Internal strip out is the umbrella; the specific job is usually one of the following — every one of these is a service we run regularly across Brisbane and the Gold Coast: **Commercial:** [commercial strip out](/services/commercial-strip-out) · [shop and office defit](/services/shop-office-strip-out) · [warehouse and industrial strip-out](/services/warehouse-industrial-strip-out) · [body corporate strip outs](/services/body-corporate) **Residential:** [residential strip out](/services/residential-strip-out) · [kitchen demolition](/services/kitchen-demolition) · [bathroom demolition](/services/bathroom-demolition) **Specialist removal & preparation:** [tile removal](/services/tile-removal) · [concrete grinding](/services/concrete-grinding) · [timber and bamboo floor removal](/services/wooden-bamboo-floor-removal) · [vinyl and carpet removal](/services/vinyl-carpet-removal) · [paint and epoxy removal](/services/paint-epoxy-removal) · [wall and partition removal](/services/wall-partition-removal) · [rubbish and debris removal](/services/rubbish-debris-removal) We service the Gold Coast, Brisbane and all the surrounding South East Queensland corridors. See our [service areas](/areas) for full coverage. # Get a free, fixed-scope quote Whether you are commissioning a commercial defit, prepping a home for renovation, or clearing a site before a full demolition, Strip It Out provides free, fixed-scope written quotes for internal strip out and internal demolition across the Gold Coast and Brisbane. We inspect the site, scope the work to your build program, and give you a clear price and timeline — no surprises, no variations sprung mid-job. Call us or send the project details and photos through our [contact page](/contact). **Includes:** - Commercial defits and end-of-lease make-goods - Residential strip outs for full renovation prep - Pre-demolition interior clearance and material salvage - QBCC-licensed, fully insured, WHSQ-compliant - Sept 2024 silica-regulation compliant — water suppression, HEPA extraction, P3 RPE - Asbestos survey coordination and licensed removalist engagement ### Warehouse & Industrial Strip Outs in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/warehouse-industrial-strip-out Large-scale warehouse and industrial strip outs including racking, offices, floor coatings, and concrete grinding. A warehouse and industrial strip out clears a large facility back to a workable shell: racking and shelving out, internal offices demolished, floor coatings ground off, and mezzanines and redundant services removed. Strip It Out handles warehouse strip outs and industrial defits across the Gold Coast and Brisbane, preparing your facility for a new tenant, a refit, or a clean lease handover. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We take on industrial sites of any scale. That includes pallet racking and shelving removal, internal office and partition demolition, suspended ceiling and lighting removal, and stripping floor coatings, line marking and adhesives. Where the slab is being prepared for a new use, we [grind the concrete](/services/concrete-grinding) and [remove old epoxy and paint coatings](/services/paint-epoxy-removal) back to bare substrate, and every load of [debris is removed and disposed of](/services/rubbish-debris-removal) responsibly. # What affects the cost of a warehouse strip out Industrial strip outs are quoted on scope and access more than floor area alone. The key factors: - The volume of racking, mezzanine steel and fixtures to dismantle and remove - Whether floor coatings, line marking or adhesives need grinding back - Site access for trucks, machinery and waste removal - Operating constraints, such as staged works to keep part of the facility running You receive a detailed, fixed-scope quote so the budget is locked in before we start. # How long a warehouse strip out takes Timeframes vary widely with size. A modest industrial unit can be cleared in a few days; a large distribution centre or multi-bay facility is staged over one to several weeks. We work efficiently and, where needed, in stages or after hours to minimise downtime and keep your facility or neighbouring tenancies operating. Warehouse and industrial strip outs often run alongside our [commercial strip out](/services/commercial-strip-out) service for the office component of a site. Whether you are decommissioning a lease, clearing for sale, or refurbishing for a new operation, we manage the whole job with one licensed crew. As a fully licensed and insured, family-owned team with more than seven years of experience, we work to Queensland WHS and environmental standards on every industrial site. Call Strip It Out for a free, fixed-scope quote on warehouse and industrial strip outs across the Gold Coast and Brisbane. **Includes:** - Racking & shelving removal - Internal office partition removal - Floor covering & coating removal - Concrete grinding & floor preparation - Mezzanine strip outs - Full debris removal & disposal ### Shop & Office Strip Outs & Defits in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/shop-office-strip-out End-of-lease make-good and defit services for retail shops, offices, and commercial tenants. A shop or office defit, also called a make-good strip out, returns a leased commercial tenancy to the condition your lease requires at end of term, usually a bare shell or the original handover state. Strip It Out provides shop and office defit services across the Gold Coast and Brisbane, working with tenants, landlords and property managers to deliver a clean, on-time handover. Your lease's make-good clause sets the condition, and the defit is the work that meets it. Our guide to [what a defit is](/blog/internal-strip-out-vs-demolition-defit) compares it with a strip out, a soft strip and a full demolition. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. A defit typically removes the previous fitout in full: partitions and walls, shopfront joinery and counters, signage and branding, floor coverings, ceiling and lighting changes, and any tenant-installed services. We read your make-good clause carefully, scope the works to match it exactly, and document the result so your bond or handover is signed off without dispute. All [waste is removed](/services/rubbish-debris-removal) and the floor is left clean, with [concrete grinding](/services/concrete-grinding) available if the slab needs preparing. # Shop defits for retail, food and shopping centre tenancies Shopping centres set their own access rules and trading hours, and the landlord or centre management usually inspects the tenancy at handover. We work within those rules for retail, food and hospitality tenancies, and can attend that make-good inspection with you. # Office strip outs and office defits An office strip out or office defit removes the tenant's fitout from an office or professional suite: partitions and walls, office furniture, ceiling and lighting changes, floor coverings and any tenant-installed services. Office buildings usually come with lift bookings and building-management sign-in, so we plan access before we arrive and work after hours where the building requires it. # What affects the cost of a shop or office defit Defit pricing depends on the make-good clause and the fitout being removed. The main factors: - The exact scope your lease specifies: shell, base build, or original condition - How extensive the existing fitout is - Centre or building access rules and after-hours requirements - Patching, painting and ceiling reinstatement, if the lease calls for it We quote to the clause, in writing, so there is no gap between our scope and what the landlord expects. # How long a shop or office defit takes Most retail and office defits are completed within one to four days, scheduled around your lease end date and the centre's trading hours. We plan the works backwards from your handover deadline and, where required, work nights or weekends so you hand the keys back on time and stop paying rent. We handle defits for retail shops, offices, food and hospitality tenancies, and professional suites, in shopping centres, strip retail and standalone buildings. For larger or full-interior projects see our [commercial strip out](/services/commercial-strip-out) service, and for [office partition removal](/services/wall-partition-removal) as a stand-alone job. Strip It Out is fully licensed and insured, family-owned, and has handled commercial make-goods across South East Queensland for more than seven years. We coordinate directly with property managers and centre management to keep the handover smooth. Call for a free, fixed-scope defit quote anywhere across the Gold Coast and Brisbane. **Includes:** - End-of-lease make-good compliance - Shop fit-out removal - Office partition & furniture removal - Floor restoration & cleaning - Signage & branding removal - Coordination with property managers ### Body Corporate Strip Out Services on the Gold Coast & Brisbane URL: https://stripitout.com.au/services/body-corporate Apartment and body corporate strip outs with careful planning around shared facilities, noise rules, and building access. A body corporate strip out is interior demolition carried out inside shared apartment, unit and townhouse buildings, where the work has to be planned around residents, common property and strata rules. Strip It Out delivers body corporate strip outs across the Gold Coast and Brisbane, working with strata managers, committees and owners to keep projects compliant and disruption-free. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We handle full apartment interior strip outs, [bathroom](/services/bathroom-demolition) and [kitchen demolition](/services/kitchen-demolition) within units, flooring removal and partition works. The difference with body corporate work is in the planning: protecting lifts, lobbies, hallways and car parks; booking service lifts and loading zones; sticking strictly to permitted noise hours; and managing dust and [debris removal](/services/rubbish-debris-removal) so common areas stay clean and safe for other residents. # What affects the cost of a body corporate strip out Body corporate jobs are priced on the work itself plus the access and compliance overhead: - The scope of demolition inside the unit - The floor level and distance from lifts and loading zones - Strata-imposed working hours and protection requirements - Waste handling and disposal logistics within a shared building We provide a clear, fixed-scope quote and liaise with your strata manager on approvals. # How long a body corporate strip out takes A single-unit strip out is usually completed in one to three days, though restricted noise hours and lift bookings can extend the schedule. We confirm the building's rules before we start and plan the works to fit within them, so there are no breaches and no complaints from neighbours. We work on individual unit renovations, whole-block refurbishments and common-property upgrades, coordinating with body corporate managers and committees throughout. For standalone houses, see our [residential strip out](/services/residential-strip-out) service. Strip It Out is fully licensed and insured, family-owned, and has worked in strata buildings across the Gold Coast and Brisbane for more than seven years. We understand the access, noise and protection demands of body corporate work and plan around them from day one. Call for a free, fixed-scope quote. **Includes:** - Body corporate & strata compliance - Common area protection - Lift & loading zone coordination - Noise restriction adherence - Full apartment interior strip outs - Careful waste management in shared buildings ### Residential Strip Outs across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/residential-strip-out Professional residential demolition for kitchens, bathrooms, full homes, and everything in between. A residential strip out is the internal demolition stage of a home renovation, removing kitchens, bathrooms, flooring, wall and ceiling linings and fixtures to leave a clean, trade-ready shell. Strip It Out provides residential strip outs and internal demolition across the Gold Coast and Brisbane, from single-room renovations to full pre-renovation house strip outs. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We handle whatever your renovation needs cleared: [kitchen demolition](/services/kitchen-demolition), [bathroom strip outs](/services/bathroom-demolition), [tile](/services/tile-removal), carpet, vinyl and timber flooring removal, [non-structural wall removal](/services/wall-partition-removal), and plasterboard, cornice and suspended ceiling removal. Licensed electricians and plumbers are coordinated to disconnect services safely before demolition begins, and all [debris is removed](/services/rubbish-debris-removal) so your builder or trades start on a genuinely clean slate. # How long a residential strip out takes A single-room strip out is often done in a day. A full-home pre-renovation strip out usually takes several days to a week, depending on size and access. We work to your builder's program so the demolition stage never becomes the bottleneck in your renovation. We strip out single rooms, whole homes, investment properties and pre-sale refreshes across the Gold Coast and Brisbane. For apartments and units inside strata buildings, see our [body corporate strip out](/services/body-corporate) service. Strip It Out is a family-owned, fully licensed and insured team that has been clearing the way for Gold Coast and Brisbane renovations for more than seven years. We treat your home with care, control dust, protect what stays, and leave the site clean. Call for a free, no-obligation quote. # What Affects the Cost of a Residential Strip Out? Whole-home and partial strip outs across the Gold Coast and Brisbane are priced on: - **Scope of rooms** - a single bathroom is a day; a full house strip out is a planned multi-day program. - **Materials being removed** - tile on sand-cement bed, glued timber and stone benchtops take longer than carpet and plasterboard. - **Asbestos status** - homes built before 1990 may need licensed asbestos removal first; we coordinate testing and clearance before we start. - **Access** - driveways, stairs, units vs houses, and how close we can position the trailer. - **Occupied vs vacant** - occupied homes need containment, dust control and daily clean-downs. - **Waste volume** - priced by load; we sort and recycle to keep disposal down. Our [strip out cost guide](/blog/how-much-does-a-strip-out-cost) explains the numbers in detail - or [book a free inspection and fixed quote](/contact). **Includes:** - Kitchen strip outs: cabinets, benchtops and appliances - Bathroom renovations: tiles, fixtures and complete gutting - Flooring removal: carpet, tiles, vinyl and timber - Wall removal: non-structural partitions - Ceiling removal: plasterboard, cornices and suspended ceilings - Complete debris removal and cleanup ### Kitchen Demolition in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/kitchen-demolition Complete kitchen demolition including cabinets, benchtops, splashbacks, flooring, and wall linings. Every kitchen renovation begins by getting the old kitchen out cleanly and completely. Strip It Out provides kitchen demolition and kitchen strip out services across the Gold Coast and Brisbane, removing cabinets, benchtops, splashbacks, appliances and flooring to hand your builder or cabinetmaker a clean, trade-ready space. Most kitchen strip outs are finished in a single day. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We remove the full kitchen: overhead and base cabinetry, benchtops, sinks and tapware, splashbacks, and the flooring beneath. Appliances are carefully disconnected, with licensed electricians and plumbers coordinated so power, gas and water points are made safe before anything comes out. Where the renovation calls for it, we strip wall and ceiling linings, take [splashback and wall tiles](/services/tile-removal) back to the substrate, and remove [all debris](/services/rubbish-debris-removal) as we go. # How long a kitchen demolition takes Most kitchen strip outs are completed in a single day. Larger kitchens, or jobs that also involve tile removal, wall removal or flooring, may take a second day. We work to your cabinetmaker's or builder's start date so the new kitchen installation is never held up. Kitchen demolition is rarely a stand-alone job. We handle kitchen-only strip outs, combined kitchen and [bathroom demolition](/services/bathroom-demolition) for whole-home renovations, open-plan conversions where a [wall is removed](/services/wall-partition-removal) with the old kitchen, and rental and investment property refreshes. For larger projects it folds into a full [residential strip out](/services/residential-strip-out). Whether it is a compact unit kitchen or a large open-plan kitchen, our family-owned, fully licensed and insured team delivers the same tidy, trade-ready result. Strip It Out has handled kitchen demolitions across the Gold Coast and Brisbane for more than seven years. Call for a free, fixed-scope quote. # What Affects the Cost of a Kitchen Demolition? Kitchen strip out pricing across Brisbane and the Gold Coast is driven by: - **Kitchen size and cabinetry volume** - more cabinetry and panelling means more labour and more waste. - **Benchtop material** - stone benchtops are heavy and need careful handling; laminate is faster. - **Splashback and floor tiles** - tiled surfaces add stripping and adhesive-removal time. - **Appliance disconnection** - plumbing and electrical must be safely isolated by licensed trades before removal. - **Access and protection** - units and occupied homes need floor and lift protection along the removal path. - **Waste volume and weight** - stone, tile and cabinetry are priced by trailer load. See our guide on [saving money on kitchen removal costs](/blog/how-to-save-money-on-kitchen-removal-costs), then [request a free quote](/contact) for a fixed price on your kitchen. **Includes:** - Cabinet & benchtop removal - Splashback & tile removal - Flooring removal beneath kitchen - Wall & ceiling lining removal as specified - Appliance disconnection coordination - Trade-ready finish & full cleanup ### Concrete Grinding across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/concrete-grinding Diamond grinding to remove glue, paint, coatings, and high spots for perfectly level surfaces. Concrete grinding is the mechanical preparation of a concrete floor, removing glue, paint, epoxy, ridges and high spots with diamond grinding equipment to leave a flat, clean, sound substrate. Strip It Out provides concrete grinding and floor preparation across the Gold Coast and Brisbane for homes, retail tenancies, warehouses and industrial sites. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We grind concrete to remove tile bedding and adhesive after [tile removal](/services/tile-removal), strip [old paint and epoxy coatings](/services/paint-epoxy-removal), take down high spots and trowel ridges, and level surfaces ready for new flooring, coatings or polishing. Every job runs with dust-controlled extraction and HEPA filtration, so even occupied homes and trading premises stay clean while we work. For the adhesive left behind once tiles come up, see our guide to [removing tile adhesive from concrete](/blog/how-to-remove-tile-adhesive-from-concrete). # How long concrete grinding takes A typical residential floor is ground and prepped in a day. Large retail or warehouse floors are quoted on area and staged to suit the site. Because we use enclosed dust extraction, grinding can usually proceed without shutting down the rest of a home or business. Concrete grinding is the natural next step after a strip out. We grind floors as part of [residential](/services/residential-strip-out), [commercial](/services/commercial-strip-out) and [warehouse strip outs](/services/warehouse-industrial-strip-out), and as a stand-alone service when you have a slab that needs preparing. It is essential prep before new tiles, vinyl, epoxy, polish or floor coatings go down. Where the old floor covering is still down, our [floor removal](/services/floor-removal) service lifts it first. Strip It Out is a family-owned, fully licensed and insured team with more than seven years of floor preparation experience across the Gold Coast and Brisbane. We deliver a precise, even, genuinely trade-ready substrate. Call for a free concrete grinding quote. # What Affects the Cost of Concrete Grinding? Concrete grinding and floor preparation across the Gold Coast and Brisbane is priced on: - **Floor area (m2)** - larger continuous areas grind faster per metre with ride-on machines. - **Coating type and thickness** - thick epoxy and glue beds need aggressive diamonds and more passes than paint or thin adhesive residue. - **Required finish** - a coating-ready CSP profile, a levelled floor, or a polished finish are different scopes. - **Edges and detail work** - lots of edges, columns and tight rooms add hand-grinding time. - **Dust control** - we run HEPA-extracted grinders as standard for silica-safe work in occupied buildings. - **Slab condition** - soft, rain-damaged or contaminated slabs can change diamond selection and pace. For coating removal specifics, see [how to remove paint from concrete](/blog/how-to-remove-paint-from-concrete) - or [get a free site measure and fixed quote](/contact). **Includes:** - Diamond grinding for surface preparation - Glue & adhesive removal - Paint & coating stripping - High-spot levelling - Dust-controlled grinding with extraction - Ready for new flooring installation ### Bathroom Demolition in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/bathroom-demolition Complete bathroom strip outs: fixtures, tiles, waterproofing bedding, and adhesive removal for a trade-ready shell. A bathroom strip out is the first stage of any bathroom renovation: removing every fixture, tile, layer of tile bedding and waterproofing membrane to leave a clean, trade-ready shell. Strip It Out provides bathroom demolition and bathroom strip outs across the Gold Coast and Brisbane, typically completed in one to two days with low-dust HEPA extraction. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We disconnect and remove the vanity, toilet, shower screen, bath and tapware, then strip wall and floor [tiles back to the substrate](/services/tile-removal). Old tile bedding, screed and waterproofing membranes come out too, so your waterproofer and tiler start on a true, level surface. Where the floor needs it, we [grind the concrete substrate](/services/concrete-grinding) flat, and we clear all [debris and rubbish](/services/rubbish-debris-removal) as we go. # How long a bathroom strip out takes Most bathroom strip outs are completed in one to two days. A simple fixture-and-tile removal is often a single day; a full gut-out including linings and substrate grinding takes two. We work to your waterproofer's and tiler's start dates so the renovation keeps moving. We handle single ensuite and main bathroom gut-outs, combined [kitchen and bathroom demolition](/services/kitchen-demolition) for whole-home renovations, multi-bathroom work for builders and investors, and apartment bathrooms as part of [body corporate](/services/body-corporate) projects. Bathroom strip outs also fold into a full [residential strip out](/services/residential-strip-out). Demolishing a tiled bathroom creates a huge amount of fine dust, and bathroom tiles often sit on a sand-and-cement bed containing crystalline silica. Our HEPA extraction, sealed work areas and floor protection keep your home clean and safe. Strip It Out is family-owned, fully licensed and insured, with more than seven years of bathroom demolitions across the Gold Coast and Brisbane. Call for a free quote. # What Affects the Cost of a Bathroom Demolition? Most bathroom strip outs across Brisbane and the Gold Coast fall within a predictable range, and the quote comes down to: - **Bathroom size and layout** - a compact ensuite is faster than a large family bathroom with a separate bath and shower. - **Wall tile height** - floor-to-ceiling tiling takes longer to strip than half-height walls. - **Bedding and screed thickness** - older bathrooms often have thick sand-cement beds under the tiles that add removal time and waste weight. - **Fixture removal** - bath, vanity, shower screen, toilet and accessories are itemised in the scope. - **Access** - unit bathrooms above ground floor need lift protection and add carry time. - **Waterproof membrane removal and grinding** - if required for the new waterproofing, this adds machine work. We've published a full pricing guide: [how much does bathroom demolition cost?](/blog/bathroom-demolition-cost) For your exact bathroom, [get a free fixed-scope quote](/contact) - most are returned within 24 hours. **Includes:** - Full fixture removal: vanity, toilet, shower, bath - Wall & floor tile removal - Tile bedding & adhesive removal - Wall & ceiling lining removal - Concrete grinding of floor substrate - Trade-ready finish for waterproofing ### Timber & Bamboo Floor Removal across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/wooden-bamboo-floor-removal Professional removal of hardwood, engineered timber, and bamboo flooring with subfloor preparation. Timber and bamboo floor removal lifts hardwood, engineered timber and bamboo flooring, along with the adhesive holding it down, and prepares the subfloor for whatever comes next. Strip It Out provides professional timber and bamboo floor removal across the Gold Coast and Brisbane, using the right equipment to do a tough job cleanly and fast. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. Timber and bamboo floors are bonded with some of the most stubborn adhesives in the trade, and direct-stick, floating and secret-nailed floors each behave differently. Our team uses ride-on and walk-behind scrapers to lift the boards efficiently, then [grinds the subfloor](/services/concrete-grinding) to remove glue residue and ridges so it is flat and ready for new flooring. The whole process is dust-controlled, and all [debris is removed](/services/rubbish-debris-removal). # What affects the cost of timber floor removal Timber and bamboo floor removal is quoted on area and difficulty: - The floor area and the type of timber or bamboo - How the floor is fixed: floating, direct-stick or secret-nailed - How much adhesive residue needs grinding off the subfloor - Site access and the volume of waste We measure the job and provide a clear, fixed quote before any work starts. # How long timber floor removal takes A standard room or home of timber flooring is usually lifted and the subfloor prepped within a day or two. Larger areas and stubborn direct-stick adhesive take longer. Because we bring proper scraping and grinding equipment, the job moves far faster, and far more cleanly, than hand removal. We remove hardwood, engineered timber and bamboo flooring from homes, units and commercial spaces, often alongside [vinyl and carpet removal](/services/vinyl-carpet-removal) and [tile removal](/services/tile-removal) when a whole floor is being replaced, and as part of a full [residential strip out](/services/residential-strip-out). Our [floor removal](/services/floor-removal) page covers every floor type we lift. Strip It Out is a family-owned, fully licensed and insured team with more than seven years of flooring removal experience across the Gold Coast and Brisbane. We leave the subfloor genuinely ready for your new floor. Call for a free timber or bamboo floor removal quote. **Includes:** - Hardwood floor removal - Engineered timber removal - Bamboo flooring removal - Adhesive & glue residue removal - Subfloor grinding & preparation - Dust-controlled process ### Vinyl & Carpet Removal across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/vinyl-carpet-removal Fast, clean removal of vinyl, linoleum, and carpet flooring with adhesive cleanup. Vinyl and carpet removal lifts old floor coverings, underlay and adhesive to leave a smooth, clean subfloor ready for your new floor. Strip It Out provides vinyl, linoleum and carpet removal across the Gold Coast and Brisbane for homes, offices and commercial spaces, including stubborn multi-layer vinyl and bitumen-backed sheet. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We remove carpet and underlay, sheet and tile vinyl, and linoleum, then clean up the adhesive and any residue left on the subfloor. Where glue or bitumen is heavily bonded, we [grind the substrate](/services/concrete-grinding) back to a smooth, sound surface. All [debris is removed](/services/rubbish-debris-removal) and disposed of, and the floor is left ready for tiling, new vinyl, timber or carpet. # Carpet removal: carpet, underlay and gripper strips Our carpet removal takes up the carpet, the underlay beneath it, the gripper strips around the edges and any adhesive, and leaves a clean subfloor. We remove carpet from homes, offices, retail spaces and large commercial floors, including commercial broadloom, and can work after hours to suit a trading business. # Vinyl and lino removal Older homes often have several layers of vinyl laid over each other, each with its own layer of adhesive. We remove every layer, whether it is sheet vinyl, vinyl tiles or linoleum, including bitumen-backed sheet, back to a clean subfloor. In homes built before 1990, we coordinate testing of the old vinyl and its adhesive before any of it comes up. # What affects the cost of vinyl and carpet removal Carpet and vinyl removal is quoted on area and how hard the covering is to lift: - The floor area in square metres - The covering type, since carpet lifts easily but old direct-stick vinyl does not - How much adhesive or bitumen residue needs grinding off - Access and the volume of waste to remove We give you a clear, fixed quote, usually per square metre or per job. # How long vinyl and carpet removal takes Carpet removal across a typical home is often done in a few hours to a day. Vinyl with heavy adhesive, or large commercial floors, take longer because of the substrate preparation involved. We work to your flooring installer's schedule so the new floor goes down on time. We handle single rooms, whole homes, offices and large commercial floors, often alongside [timber floor removal](/services/wooden-bamboo-floor-removal) and [tile removal](/services/tile-removal) when an entire floor is changing, and as part of [commercial strip outs](/services/commercial-strip-out) and residential renovations. Our [floor removal](/services/floor-removal) page brings tile, timber, vinyl, carpet and coatings together in one place. Strip It Out is family-owned, fully licensed and insured, with more than seven years removing floor coverings across the Gold Coast and Brisbane. We do the messy part quickly and leave a smooth subfloor. Call for a free vinyl or carpet removal quote. **Includes:** - Carpet & underlay removal - Vinyl & linoleum removal - Adhesive & glue cleanup - Subfloor preparation - Large area & commercial coverage - Eco-friendly disposal ### Tile Removal in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/tile-removal Low-dust tile removal from floors and walls using the latest tools and dust extraction technology. Tile removal is the dustiest, most labour-intensive part of most renovations, and the part most worth handing to specialists. Strip It Out provides low-dust tile removal across the Gold Coast and Brisbane, lifting floor and wall tiles, the bed they sit on and the adhesive beneath, to leave a clean substrate ready for new flooring. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. Old tiles are stubborn. Floor tiles are usually laid on a thick sand-and-cement bed; wall tiles can pull the plasterboard with them if they are not removed correctly. We use professional tile removal tools, ride-on and walk-behind scrapers for large areas, and HEPA dust extraction to keep airborne dust to a minimum. Afterwards we [grind the substrate](/services/concrete-grinding) flat and remove all [debris and rubble](/services/rubbish-debris-removal). Our guide to [removing tile adhesive from concrete](/blog/how-to-remove-tile-adhesive-from-concrete) explains when a slab needs grinding. # How long tile removal takes A single bathroom or small floor is often stripped in a day. Larger floors and full homes take longer, especially where a thick mud bed has to come up. Our dust extraction means the work can usually go ahead without closing down the rest of the house or business. We remove ceramic, porcelain and natural stone floor tiles, wall tiles and splashbacks, and large-format and commercial tiling. Tile removal is a core part of every [bathroom demolition](/services/bathroom-demolition) and [kitchen demolition](/services/kitchen-demolition) we carry out, and it pairs naturally with [vinyl and carpet removal](/services/vinyl-carpet-removal) when a whole floor is being replaced. For every other floor type, see our [floor removal](/services/floor-removal) services. We handle every tile type: ceramic tile removal and natural stone, on both floors and walls. Floor tile removal is usually the bigger job because of the sand-and-cement bed underneath; wall tile removal is faster but still needs careful handling so the plasterboard or villaboard behind it isn't damaged. Every job uses the same low-dust HEPA extraction setup described above, whatever the tile type. Tile bedding and adhesive contain crystalline silica, so proper dust extraction protects your home's air quality and everyone on site. Strip It Out is family-owned, fully licensed and insured, with more than seven years of low-dust tile removal across the Gold Coast and Brisbane. Send photos for a free, fixed-scope quote. # What Affects the Cost of Tile Removal? Every tile removal job is quoted on its own scope, but the price always comes down to a handful of factors: - **Floor area (m2)** - the single biggest driver. Larger open areas are often cheaper per square metre than small cut-up rooms. - **Tile type and bedding** - porcelain on a thick sand-cement bed takes longer than ceramic glued direct to the slab. - **Adhesive removal and grinding** - if the slab needs to be ground flat for new floor coverings, that adds machine time. - **Access** - ground-floor jobs with close parking are quicker than high-rise units that need lift protection and longer carry distances. - **Dust control requirements** - occupied homes and commercial sites need full HEPA extraction and containment, which we include as standard. - **Waste volume** - tile and bedding is heavy; disposal is priced by weight. For a detailed breakdown of how strip out pricing works, see our guide on [how much a strip out costs](/blog/how-much-does-a-strip-out-cost) - or [request a free fixed-scope quote](/contact) and we'll price your exact job. **Includes:** - Floor & wall tile removal - Tile bedding & screed removal - Low-dust extraction technology - HEPA filtration for air quality - Substrate grinding & preparation - Residential & commercial projects ### Paint & Epoxy Removal across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/paint-epoxy-removal Professional removal of paint, epoxy coatings, and surface treatments from concrete and masonry surfaces. Paint and epoxy removal strips old coatings, including epoxy, polyurethane, floor paint and sealers, from concrete and masonry back to a bare, sound surface ready for a new finish. Strip It Out provides paint and epoxy removal across the Gold Coast and Brisbane for garages, warehouses, retail floors and industrial slabs. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. Coatings on concrete are designed to bond hard, so removing them properly takes the right equipment. We use diamond grinding and surface preparation methods to strip epoxy, polyurethane, paint and sealers without damaging the slab, then leave the [concrete ground](/services/concrete-grinding) flat and profiled for the next coating or floor. The process is dust-controlled with HEPA extraction, and all [debris is removed](/services/rubbish-debris-removal). # What affects the cost of paint and epoxy removal Coating removal is quoted on area and how tough the coating is: - The floor area being stripped - The coating type and thickness: a single floor paint versus a built-up epoxy system - How well the coating is bonded and the slab's condition - The surface profile the next coating requires We assess the floor and provide a clear, fixed quote before starting. # How long paint and epoxy removal takes A residential garage floor is usually stripped and prepped within a day. Large industrial and warehouse floors are quoted on area and staged to suit the site. Dust-controlled grinding means surrounding areas stay clean throughout. We remove coatings from garage floors, warehouse and factory slabs, retail and commercial floors, and driveways. Paint and epoxy removal pairs closely with our [concrete grinding](/services/concrete-grinding) service and is often part of a [warehouse and industrial strip out](/services/warehouse-industrial-strip-out). If an old floor covering has to come up first, see our [floor removal](/services/floor-removal) services. Strip It Out is a family-owned, fully licensed and insured team with more than seven years of coating removal and floor preparation across the Gold Coast and Brisbane. We hand over a bare, profiled slab ready for its new finish. Call for a free paint and epoxy removal quote. **Includes:** - Epoxy coating removal - Floor paint stripping - Polyurethane removal - Concrete surface restoration - Diamond grinding methods - Dust-controlled process ### Rubbish & Debris Removal across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/rubbish-debris-removal Fast removal of demolition waste, construction debris and bulky rubbish, with responsible disposal and a swept, ready site. Rubbish and debris removal clears demolition waste, construction debris and bulky rubbish from a site and disposes of it responsibly. Strip It Out provides rubbish and debris removal across the Gold Coast and Brisbane, keeping job sites safe, workable and ready for the next stage. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. We remove and haul away the heavy, awkward material many rubbish services turn down: broken tiles and tile bedding, timber and plasterboard offcuts, ripped-up flooring and carpet, old cabinetry and shopfittings, redundant fixtures and general renovation rubble. Material is loaded by hand or machine, taken away by truck, and sorted for recycling wherever possible before disposal at licensed facilities. # What affects the cost of rubbish and debris removal Rubbish removal is quoted on volume and access: - The amount and weight of material to remove - The type of waste and whether it can be recycled or needs special disposal - Site access for trucks and how far material must be carried - Whether removal is a one-off clean-up or staged over a project We quote clearly per job so you know the cost before we load the first truck. # How long rubbish and debris removal takes Most site clean-ups are completed in a single visit. On larger projects we schedule staged removals so debris never piles up, and we can work to your build program, including weekends. We clear waste after [residential](/services/residential-strip-out) and [commercial strip outs](/services/commercial-strip-out), builder and renovation site clean-ups, [body corporate](/services/body-corporate) and strata clear-outs, and bulky furniture, whitegoods and office removals. Rubbish removal is included in every full strip out we do, and is available as a stand-alone service when you have handled the demolition yourself. A clear site is a faster, safer site. Strip It Out is family-owned, fully licensed and insured, with more than seven years of demolition and waste removal across the Gold Coast and Brisbane. Call for a free, fixed-price rubbish removal quote. **Includes:** - Demolition and construction waste removal - Bulky household and office rubbish removal - Old furniture, fixtures and shopfitting debris - Tiles, timber, plasterboard and flooring offcuts - Skip bin loading and truck haulage - Responsible sorting, recycling and tip disposal ### Wall & Partition Removal in Brisbane & the Gold Coast URL: https://stripitout.com.au/services/wall-partition-removal Safe removal of non-structural internal walls and partitions to open up homes, offices and retail spaces. Wall and partition removal is the demolition of non-structural internal walls to open up or reconfigure a space, turning a closed-off kitchen into open-plan living, or clearing tired office partitions for a new layout. Strip It Out removes internal walls and partitions across the Gold Coast and Brisbane: cleanly, safely, and with the mess taken care of. Part of our broader [internal strip out and demolition services](/services/internal-strip-out) — see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. After confirming a wall is non-structural, we coordinate licensed electricians and plumbers to relocate any wiring, switches, power points or pipework inside it, then demolish the wall, whether it is a timber or steel stud wall lined with plasterboard, a rendered masonry partition, or a commercial partition system. You are left with a clean opening, all [debris removed](/services/rubbish-debris-removal), and the floor, ceiling and adjoining walls ready for your plasterer to patch and finish. # What affects the cost of wall and partition removal Wall removal is quoted on the wall and what is inside it: - The size and construction of the wall: stud, masonry or partition system - Services hidden in the wall that need relocating by licensed trades - Patching and making good of the floor, ceiling and adjoining walls - Access and waste removal We assess the wall and provide a clear, fixed-scope quote. # How long wall and partition removal takes A single non-structural wall is often removed in a day, including debris removal. Multiple walls, or walls with services to relocate, take longer. We coordinate the electrical and plumbing work so the whole job runs as one smooth sequence. Wall and partition removal opens up kitchens and living areas in home renovations, clears office partitions and meeting-room walls, reconfigures retail and [commercial spaces](/services/commercial-strip-out), and is often done with a [kitchen demolition](/services/kitchen-demolition) or as part of a full [residential strip out](/services/residential-strip-out) or [shop and office defit](/services/shop-office-strip-out). Safety comes first: if a wall is load-bearing, it needs an engineer and a builder, and we will tell you so honestly rather than take on work that is not ours. For non-structural walls, Strip It Out, a family-owned, fully licensed and insured team with more than seven years of experience, makes wall removal straightforward across the Gold Coast and Brisbane. Call for a free quote. **Includes:** - Non-structural wall and partition removal - Office partition and stud-wall demolition - Open-plan kitchen and living conversions - Plasterboard, render and brick partition removal - Licensed electrical and plumbing disconnection - Debris removal and a clean, patch-ready opening ### Floor Removal & Floor Stripping across the Gold Coast & Brisbane URL: https://stripitout.com.au/services/floor-removal Removal of tile, timber, bamboo, vinyl, carpet and floor coatings, with adhesive removal and slab preparation for your new floor. Floor removal, also called floor stripping or floor demolition, means lifting the old floor covering along with the adhesive or bedding holding it down, and leaving a clean, flat subfloor ready for your new floor. Strip It Out provides floor removal and floor stripping across the Gold Coast and Brisbane for homes, units, offices, shops and warehouses, from a single room to a full commercial floor. Part of our broader [internal strip out and demolition services](/services/internal-strip-out): see the hub page for the Queensland regulatory framework, process, cost factors and contractor vetting checklist. Every floor comes out in two stages: lifting the covering, then dealing with what was holding it down. We use ride-on and walk-behind scrapers to strip large areas quickly, then grind away glue residue, tile bedding and ridges. Tile removal and slab grinding run with low-dust HEPA extraction, and all [debris and rubble](/services/rubbish-debris-removal) is removed from site. # Tiled floors Floor tiles are usually laid on a thick sand-and-cement bed, so the bed has to come up with them. We remove ceramic, porcelain and natural stone floor tiles, as well as wall tiles and splashbacks, and take the bedding and adhesive back to the substrate. See [tile removal](/services/tile-removal) for the full method. # Timber and bamboo floors Direct-stick, floating and secret-nailed timber floors each come up differently, and timber and bamboo are bonded with some of the most stubborn adhesives in the trade. We lift hardwood, engineered timber and bamboo, then grind off the glue so the subfloor is flat. See [timber and bamboo floor removal](/services/wooden-bamboo-floor-removal). # Vinyl, lino and carpet Carpet, underlay and gripper strips come up quickly. Old vinyl, linoleum and bitumen-backed sheet take longer because of the adhesive underneath, and older homes often have several layers. In homes built before 1990 we coordinate testing first, then remove every layer back to the subfloor and clean up the residue. See [vinyl and carpet removal](/services/vinyl-carpet-removal). # Painted and epoxy-coated slabs Epoxy, polyurethane, floor paint and sealers are stripped from garage, retail and warehouse slabs by diamond grinding, leaving bare, sound concrete profiled for the next coating or floor. See [paint and epoxy removal](/services/paint-epoxy-removal). # Grinding the slab Once the old floor is up, [concrete grinding](/services/concrete-grinding) takes off leftover adhesive, tile bedding, high spots and trowel ridges, so new tiles, vinyl, timber, carpet or a coating go down flat and bond properly. It is the standard next step after tile or coating removal. # How long floor removal takes Carpet across a typical home is often lifted in a few hours to a day. A single bathroom or small tiled floor is often stripped in a day, and a standard room or home of timber flooring is usually lifted and prepped within a day or two. Large floors, thick mortar beds and direct-stick adhesive take longer, so we quote and schedule them on area. Strip It Out is family-owned, fully licensed and insured. Send photos of the floor for a free, fixed-scope quote, or [contact us](/contact) and we'll price your exact job. **Includes:** - Tile & tile bedding removal - Timber & bamboo floor removal - Vinyl, lino & carpet removal - Paint & epoxy coating removal - Adhesive removal & slab grinding - Low-dust HEPA extraction ## Frequently Asked Questions (120) **Q: Where do you work across the Gold Coast and Brisbane?** A: We service the entire Gold Coast, Brisbane, Logan, and Northern NSW including Southport, Surfers Paradise, Broadbeach, Burleigh Heads, Robina, Helensvale, Coomera, and surrounding suburbs, plus the Tweed Heads area. **Q: What is a strip-out, exactly?** A: A strip-out is a form of internal demolition that involves removing non-structural elements such as walls, finishes, fixtures, and joinery. This leaves a clean, trade-ready shell for renovation or refurbishment. **Q: What's included in a typical strip-out service?** A: A typical strip-out includes wall and partition removal, cabinet removal, tile removal, floor covering removal, ceiling and wall lining removal, debris disposal, and a thorough final cleanup. **Q: Do you do both residential and commercial strip-outs?** A: Yes, we handle everything from bathroom and kitchen strip outs in homes through to full commercial office, shop, restaurant, and warehouse defits. **Q: Do you handle warehouse and industrial strip-outs?** A: Absolutely. We handle racking and shelving removal, internal office demolition, floor covering and coating removal, and concrete grinding and floor preparation for industrial spaces. **Q: Can you work in apartments and body corporate buildings?** A: Yes, we're experienced in body corporate environments. We plan carefully around lifts, loading zones, noise restrictions, and common area protection. **Q: What floor removal services do you offer?** A: We remove tiles, tile bedding, timber, bamboo, cork, vinyl, and carpet. We also offer concrete grinding and subfloor preparation for new flooring installation. **Q: What is concrete grinding and why is it needed?** A: Concrete grinding uses diamond grinding equipment to remove glue, paint, coatings, and high spots from concrete surfaces, creating a perfectly level substrate for new flooring. **Q: Are you licensed, insured and safety focused?** A: Yes, we hold proper licenses and carry comprehensive public liability and workers' compensation insurance. We follow strict Australian and Queensland safety standards on every project. **Q: Do you check for asbestos before stripping out?** A: If asbestos is suspected, we immediately stop work and recommend a licensed asbestos assessor. If confirmed, a licensed removalist handles the removal before we continue. **Q: How do you manage silica dust from concrete and tiles?** A: We use dust extraction equipment, wet methods, HEPA vacuums, task-specific controls, and respiratory protection for our workers to manage silica dust safely. **Q: Will you disconnect plumbing and electrical services?** A: Licensed electricians and plumbers are required for disconnection to ensure safety and compliance. Our team coordinates with these trades for you. **Q: How much does a strip-out cost?** A: Cost depends on the size of the project, materials being removed, access, waste disposal, and any grinding required. We provide clear, fixed-scope quotes so there are no surprises. **Q: Are your quotes free?** A: Yes, all our quotes are free and no-obligation. We can often provide quotes from photos, measurements, and plans. **Q: How far in advance should I book?** A: For residential projects, we recommend 2-3 weeks advance notice. For commercial or lease handover projects, contact us as soon as possible to secure your preferred dates. **Q: What payment methods do you accept?** A: Bank transfer is our standard payment method. Card payments and alternative arrangements can be discussed as needed. **Q: How long will my strip-out or demolition take?** A: Timelines vary: bathrooms take 1-2 days, kitchens around 1 day, apartments 1-2 days, and larger commercial projects can take several days. We'll give you a clear timeline with your quote. **Q: Will you leave the area clean afterwards?** A: Absolutely. All demolition waste is removed, the area is swept and vacuumed, and it's left in a trade-ready condition for the next stage of your project. **Q: What happens if you discover hidden issues behind walls or floors?** A: We stop work, show you the issue, and explain your options. The scope is then adjusted accordingly, or we refer an appropriate trade if needed. **Q: Do you guarantee your work?** A: Yes, we stand behind the quality and completeness of our work as agreed in the scope. If anything needs correcting, we return to make it right. **Q: How long does a commercial strip out take?** A: Timelines vary based on the size and complexity of the space. A small retail shop might take 1-2 days, while a large office floor could take a week. We provide a clear timeline with every quote. **Q: Do you work outside business hours for commercial strip outs?** A: Yes, we can schedule work outside business hours or on weekends to minimise disruption to your business or neighbouring tenants. **Q: Can you handle asbestos in commercial buildings?** A: If asbestos is suspected or found, we stop work immediately and recommend a licensed asbestos assessor. We coordinate with licensed removalists before resuming. **Q: What does a warehouse strip out include?** A: Our warehouse strip outs cover racking and shelving removal, internal office demolition, floor covering and coating removal, concrete grinding, and full waste disposal. **Q: Can you remove mezzanine floors?** A: Yes, we handle mezzanine strip outs including the flooring, handrails, and internal fit-out. Structural steel removal may require a separate structural demolition contractor. **Q: How do you handle large-scale waste from industrial strip outs?** A: We arrange appropriate skip bins and waste disposal for industrial volumes. All waste is disposed of responsibly in accordance with Queensland regulations. **Q: What is a make-good or defit?** A: A make-good is the clause in your lease that sets the condition you must hand the tenancy back in at the end of the lease; a defit is the strip out that meets it, returning the space to its original condition or the condition your lease specifies. **Q: Do you coordinate with property managers for defits?** A: Yes, we regularly work with property managers and landlords to ensure the make-good meets lease requirements. We can attend site inspections and coordinate directly. **Q: How far in advance should I book a lease make-good?** A: We recommend booking at least 2-3 weeks before your required completion date. For larger spaces, contact us as early as possible to secure your preferred dates. **Q: How do you manage noise in body corporate buildings?** A: We adhere strictly to body corporate noise restrictions, typically working within approved hours. We communicate with the building manager to coordinate lift access and loading zones. **Q: Do you protect common areas during body corporate strip outs?** A: Absolutely. We lay protective coverings on all shared surfaces including hallways, lifts, and lobby areas. We ensure the building is left clean at the end of each day. **Q: Can you strip out a unit while other residents are home?** A: Yes, we plan carefully to minimise disruption to other residents, including managing dust containment and noise levels. **Q: What is included in a residential strip out?** A: A residential strip out can include kitchen removal, bathroom demolition, flooring removal, wall and ceiling removal, and full debris disposal. We tailor the scope to your renovation plans. **Q: Do you strip out entire houses?** A: Yes, we handle complete home gut-outs where everything internal is removed back to the structural frame, ready for a full renovation. **Q: Will you clean up after the strip out?** A: Every job includes a thorough cleanup. We remove all demolition waste, sweep, and vacuum the area so it is trade-ready for the next stage of your renovation. **Q: How long does a kitchen demolition take?** A: Most kitchen demolitions are completed in a single day, depending on size and scope. We provide a clear timeline with your quote. **Q: Do you remove kitchen flooring as well?** A: Yes, we remove all flooring within the kitchen area including tiles, vinyl, and timber, leaving a clean substrate for your new floor. **Q: Will you disconnect plumbing and gas for the kitchen?** A: Licensed plumbers and gas fitters handle disconnections. We coordinate with these trades to ensure everything is safely disconnected before demolition begins. **Q: What is concrete grinding used for?** A: Concrete grinding removes glue, paint, epoxy coatings, and high spots from concrete surfaces, creating a perfectly level substrate for new flooring installation. **Q: Is concrete grinding dusty?** A: We use diamond grinders with integrated dust extraction to minimise airborne dust. Our equipment captures dust at the source for a cleaner, safer process. **Q: Can you grind outdoor concrete surfaces?** A: Yes, we grind both indoor and outdoor concrete surfaces including patios, driveways, and balconies across the Gold Coast and Brisbane. **Q: Is a bathroom strip out the same as bathroom demolition?** A: Yes. Bathroom strip out and bathroom demolition are two names for the same job. We remove the fixtures, wall and floor tiles, tile bedding and old waterproofing membrane to leave a clean, trade-ready shell for your waterproofer and tiler. **Q: How long does a bathroom demolition take?** A: Most bathroom strip outs take 1-2 days depending on size. A small ensuite might be done in a day, while a larger bathroom with separate bath and shower could take two days. **Q: Do you remove the waterproofing membrane?** A: Yes, we remove the existing waterproofing membrane so your waterproofer can apply a fresh membrane to the clean substrate. **Q: Is there a risk of damaging pipes during bathroom demolition?** A: Our team is experienced in working around plumbing. We take care to avoid damage to pipes and coordinate with licensed plumbers when disconnection is required. **Q: Why is professional timber floor removal recommended?** A: Timber flooring adhesive is industrial-strength and extremely difficult to remove without professional ride-on scrapers and diamond grinders. DIY attempts usually damage the subfloor. **Q: Can you remove bamboo flooring?** A: Yes, we remove bamboo flooring using the same professional equipment as timber. Bamboo adhesives can be particularly tenacious, making professional removal even more important. **Q: Do you prepare the subfloor after timber removal?** A: Yes, we grind the subfloor after removing timber or bamboo to remove all adhesive residue, leaving a smooth surface ready for your new flooring. **Q: How long does vinyl removal take?** A: A typical residential vinyl removal takes less than a day. The timeline depends on the area size, number of adhesive layers, and whether concrete grinding is needed. **Q: Can you remove multiple layers of vinyl?** A: Yes, older homes often have several layers of vinyl. We remove all layers including each adhesive layer, right down to the concrete slab. **Q: Do you remove carpet underlay and gripper strips?** A: Yes, our carpet removal includes the underlay, gripper strips, and any adhesive, leaving a clean subfloor. **Q: Is tile removal dusty?** A: It can be, but we use low-dust methods including dust extraction equipment and HEPA-filtered vacuums to keep dust to an absolute minimum during tile removal. **Q: Do you remove the tile bedding as well as the tiles?** A: Yes, we remove both the tiles and the cement bedding or adhesive underneath. This is essential for a proper substrate finish. **Q: Can you remove tiles from walls as well as floors?** A: Yes, we remove tiles from both floors and walls, including bathroom and kitchen splashback tiles. **Q: What types of coatings can you remove?** A: We remove epoxy, paint, polyurethane, sealers, and other coatings from concrete surfaces using diamond grinding methods. **Q: Is epoxy removal messy?** A: Our diamond grinding process includes integrated dust extraction, so epoxy and paint removal is a relatively clean process compared to chemical stripping methods. **Q: Can you remove paint from concrete garage floors?** A: Yes, we commonly remove paint and coatings from garage floors, warehouse floors, and commercial concrete surfaces across the Gold Coast and Brisbane. **Q: How much does a commercial strip out cost on the Gold Coast?** A: Commercial strip outs typically cost AUD 80 to AUD 200 per square metre on the Gold Coast and Brisbane. Final pricing depends on building access, fixture density, asbestos risk and waste volume. We provide free fixed-scope quotes within 24 hours. **Q: Do you do bathroom strip outs near me?** A: Yes. Strip It Out provides bathroom strip outs right across the Gold Coast and Brisbane, including Logan, the northern Gold Coast corridor and the Tweed. Tell us your suburb when you call and we will confirm availability and book a free, no-obligation quote. **Q: How much does a warehouse strip out cost?** A: Warehouse and industrial strip outs typically cost AUD 60 to AUD 150 per square metre, depending on racking density, floor coatings and access. We provide free fixed-scope quotes for sites across the Gold Coast and Brisbane. **Q: What is left after a bathroom demolition?** A: After a bathroom strip out you are left with a clean, trade-ready shell: bare wall and floor substrate with all fixtures, tiles, bedding and old waterproofing removed. The space is ready for your waterproofer and tiler to begin straight away. **Q: What does a shop or office defit cost in Queensland?** A: Shop and office defits typically cost AUD 100 to AUD 300 per square metre depending on the lease make-good condition required. We work to fixed-scope quotes that match your lease wording exactly. **Q: Do you get body corporate approval before starting?** A: We help you prepare for it. Strip It Out provides the scope, insurance details and schedule your strata manager or committee needs for approval, and we plan the works around the building's by-laws. The owner or committee lodges the formal application. **Q: How much does a body corporate strip out cost?** A: Body corporate strip outs typically cost AUD 90 to AUD 220 per square metre depending on access, lift requirements and noise restrictions. We work with strata managers to coordinate quiet-hour scheduling. **Q: Do you remove the rubbish from body corporate jobs?** A: Yes. We carry all demolition debris out through agreed access routes, protect lifts and common areas, and remove every load from site for responsible disposal, so shared areas are left clean. Bulky strata rubbish removal can also be booked on its own. **Q: How much does a residential strip out cost?** A: Residential strip outs typically cost AUD 1,500 to AUD 8,000 for a single room renovation, or AUD 8,000 to AUD 25,000 for a full home gut-out. Pricing depends on size, fixtures and finish removal scope. **Q: Do you provide free quotes for commercial strip outs?** A: Yes. Every commercial strip out and defit starts with a free, fixed-scope written quote. Send through your plans, lease make-good clause or a site brief and we will return an itemised quote, usually within 24 hours. **Q: How much does kitchen demolition cost in Gold Coast and Brisbane?** A: Kitchen demolition typically costs AUD 800 to AUD 2,500 on the Gold Coast and Brisbane. Final pricing depends on cabinetry size, splashback and flooring inclusion, plus access difficulty. Free quotes from photos. **Q: Can you strip out a tenancy while neighbouring businesses trade?** A: Yes. We contain dust with barriers, protect shared areas and lifts, and schedule noisy work for after hours or weekends where needed, so adjacent tenancies keep trading while we strip out your space. **Q: What does concrete grinding cost per square metre?** A: Concrete grinding typically costs AUD 25 to AUD 80 per square metre depending on coating type and area. Light grinding for adhesive removal sits at AUD 25 to 45; epoxy or paint stripping is AUD 40 to 80 per square metre. **Q: Do you grind floors after tile or coating removal?** A: Yes. Concrete grinding is the standard next step after tile or coating removal. We grind off leftover adhesive, tile bedding and ridges to leave a flat, sound substrate ready for new flooring, polishing or a fresh coating. **Q: How much does bathroom demolition cost?** A: Bathroom demolition typically costs AUD 1,500 to AUD 4,500 across the Gold Coast and Brisbane. Pricing depends on size, tile type, access and asbestos risk in older homes. Itemised fixed-scope quotes available. **Q: Do you offer concrete grinding across the Gold Coast and Brisbane?** A: Yes. Strip It Out provides concrete grinding and floor preparation right across the Gold Coast and Brisbane corridor for homes, retail tenancies and warehouses. Tell us your location and floor area for a free quote. **Q: How much does timber floor removal cost?** A: Timber and bamboo floor removal typically costs AUD 25 to AUD 45 per square metre on the Gold Coast and Brisbane. Includes ride-on scraping, adhesive removal and subfloor prep. Free quote from photos. **Q: Do you remove kitchen tiles and splashbacks?** A: Yes. We remove splashback and wall tiles back to the substrate as part of a kitchen strip out, along with cabinets, benchtops and flooring. The space is left clean and trade-ready for your cabinetmaker or builder. **Q: What does vinyl or carpet removal cost?** A: Carpet removal typically costs AUD 8 to AUD 15 per square metre. Vinyl removal with adhesive cleanup is AUD 15 to AUD 30 per square metre. Multi-layer or bitumen vinyl may cost more due to extra grinding. **Q: Can you remove a wall during a kitchen demolition?** A: Yes. Open-plan kitchen conversions are common. We can remove a non-structural wall alongside the kitchen strip out, coordinating licensed trades for any wiring or plumbing inside it. Load-bearing walls are referred to a builder and engineer. **Q: How much does tile removal cost in Brisbane and Gold Coast?** A: Tile removal typically costs AUD 30 to AUD 60 per square metre for residential and AUD 40 to AUD 80 per square metre for heavy commercial tiles. Includes bedding removal and substrate prep. **Q: Do you remove epoxy from warehouse and commercial floors?** A: Yes. We strip epoxy, polyurethane and floor paint from warehouse, factory, retail and garage slabs using diamond grinding, then leave the concrete profiled and ready for a new coating or floor. Large floors are quoted by area. **Q: What does paint or epoxy removal cost?** A: Paint and epoxy removal typically costs AUD 30 to AUD 80 per square metre depending on coating thickness and surface. Diamond grinding handles all common coatings in a single pass. **Q: Is the slab usable after paint and epoxy removal?** A: Yes. We remove coatings back to bare, sound concrete and grind it to the profile your next finish needs. The slab is left clean, flat and ready for a new coating, polish or floor covering. **Q: Do you do residential strip outs near me?** A: Yes. Strip It Out provides residential strip outs and internal demolition across the Gold Coast, Brisbane, Logan and the Tweed. Tell us your suburb and the rooms involved, and we will arrange a free, no-obligation quote. **Q: Do you disconnect power and plumbing before a strip out?** A: Yes. We coordinate licensed electricians and plumbers to safely disconnect power, gas and water before demolition begins, so the strip out is carried out safely and to code. **Q: Will a defit pass the landlord's make-good inspection?** A: That is the goal. We scope the works directly to your lease make-good clause, document the finished condition, and coordinate with the property manager, so the tenancy is handed back in the required state without dispute. **Q: Do you remove signage and shopfront fitout?** A: Yes. A shop defit includes removing signage, branding, shopfront joinery, counters, partitions, flooring and lighting, returning the tenancy to a bare shell or the condition your lease specifies. **Q: Do you offer dust-free tile removal?** A: We offer low-dust tile removal. Our equipment runs with HEPA dust extraction and we seal off work areas, which captures the vast majority of airborne dust, so the work can go ahead even in occupied homes. **Q: Can you remove tiles near me on the Gold Coast or in Brisbane?** A: Yes. Strip It Out provides tile removal right across the Gold Coast and Brisbane, from single bathrooms to full commercial floors. Send a photo of your tiled area and we will return a free, fixed-scope quote. **Q: Do you prepare the subfloor after removing vinyl or carpet?** A: Yes. We clean up adhesive and residue, and where glue or bitumen is heavily bonded we grind the substrate back to a smooth, sound surface ready for your new flooring. **Q: Can you remove flooring from commercial premises?** A: Yes. We remove carpet and vinyl from offices, retail spaces and large commercial floors, including commercial broadloom and bitumen-backed sheet, and can work after hours to suit a trading business. **Q: Can you remove pallet racking and shelving?** A: Yes. Racking, shelving and mezzanine removal are core parts of a warehouse strip out. We dismantle and remove storage systems, internal offices and fixtures, and haul all material off site for responsible disposal. **Q: What's the difference between an internal strip out and a full demolition?** A: An internal strip out removes only non-structural elements (partitions, ceilings, floors, fixtures), leaving the structural shell intact. A full demolition removes the entire building including load-bearing walls, slab and roof. They require different licences and approvals — strip outs are usually a one-to-six-week job; full demolitions take longer and need a WorkSafe Queensland demolition licence and council approval. **Q: Can you strip out a warehouse in stages to avoid downtime?** A: Yes. For operating facilities we stage the strip out and work after hours where needed, so part of the warehouse can keep running while we clear the rest. **Q: Do I need a QBCC-licensed contractor for an internal strip out in Queensland?** A: Yes. Any building work in Queensland valued over $3,300 requires a QBCC-licensed contractor. Internal strip-out work is classified as building work under the QBCC Act, so a current QBCC contractor licence of the appropriate class is required for any commercial-priced job. Verify your contractor's licence at the QBCC's "Find a Local Contractor" tool before signing. **Q: Can you remove glued-down (direct-stick) timber floors?** A: Yes. Direct-stick timber and bamboo floors are the toughest to remove. We use ride-on and walk-behind scrapers to lift the boards, then grind off the adhesive residue so the subfloor is flat and ready for new flooring. **Q: Do I need a council permit for an internal strip out in Brisbane or the Gold Coast?** A: Usually no for pure non-structural interior strip outs in commercial tenancies. You generally do need a permit or development approval when a structural wall is being touched, the building is heritage-listed, the project precedes a full demolition, or essential safety services (sprinklers, alarms) are being altered. Confirm with Brisbane City Council or Gold Coast City Council, or an accredited building certifier, before scope is finalised. **Q: How much dust does timber floor removal create?** A: Lifting boards creates little dust; grinding the adhesive residue afterwards creates more. We run dust extraction during grinding to keep airborne dust low, so the work stays clean even in an occupied home. **Q: How long does an internal strip out take?** A: On-site durations: a single residential room (kitchen or bathroom) is 1-2 days; a full residential strip out runs 3-7 days; a small commercial defit (under 200 m²) is 3-7 days; a mid-sized defit (200-1,000 m²) takes 1-3 weeks; a large floor plate (over 1,000 m²) is 3-6 weeks. Allow an extra 1-2 weeks for pre-start activities (asbestos survey, service isolation, SWMS). **Q: What does rubbish and debris removal include?** A: We clear demolition waste, construction debris and bulky rubbish from your site: broken tiles, timber and plasterboard offcuts, ripped-up flooring, old cabinetry, fixtures and general renovation rubble. Material is loaded, hauled away and disposed of responsibly. **Q: Can I do an internal strip out myself?** A: For low-value residential work in your own owner-occupied home, you can do limited DIY — though over $3,300 in scope requires a licensed contractor in Queensland. Any commercial work, any work involving asbestos (in pre-1990 buildings), and any silica-generating work all require licensed and trained professionals. DIY strip out is also where most workplace dust injuries happen — silica and asbestos exposure is cumulative and irreversible. **Q: How much does rubbish and debris removal cost?** A: Rubbish removal is quoted on the volume and weight of material, the type of waste, and site access for trucks. We give you a clear, fixed price per job before we load the first truck, so there are no surprises. **Q: Do services need to be disconnected before the strip out starts?** A: Yes. Power, gas, water and fire services must be formally isolated by the relevant licensed trades — licensed electrician, plumber and gas fitter — before the strip-out crew arrives. This is non-negotiable for safety and is regulated. A reputable contractor coordinates this as part of the pre-start sequence and schedules strip-out only once isolation certificates are received. **Q: Do you remove demolition and construction waste?** A: Yes, that is our specialty. We handle the heavy, awkward demolition and construction waste many general rubbish services turn down, and sort it for recycling where possible before disposal at licensed facilities. **Q: What happens if my building has asbestos?** A: Buildings constructed before 1990 should be treated as potentially containing asbestos until a refurbishment/demolition asbestos survey says otherwise. In Queensland, removal of more than 10 m² of non-friable (bonded) asbestos requires a Class B asbestos removal licence; any friable asbestos requires a Class A licence regardless of amount. Strip It Out coordinates the survey and engages a licensed removalist where required — we don't disturb suspect materials ourselves. **Q: How quickly can you clear a site?** A: Most site clean-ups are completed in a single visit. For larger projects we schedule staged removals so debris never piles up, and we can work to your build program, including weekends. **Q: What happens to the waste from an internal strip out?** A: Waste is sorted on-site where practical — metals, recoverable timber, clean concrete and salvageable fixtures separated from general waste. Recoverable material is sent to recyclers; general waste goes to licensed landfill with the Queensland Waste Levy paid on disposal. Australia's national construction and demolition recovery rate is 84% (DCCEEW National Waste Report 2024) — we work to that benchmark or better. **Q: Do you do rubbish removal for body corporate and strata properties?** A: Yes. We handle bulky waste and clear-outs for body corporate and strata properties across the Gold Coast and Brisbane, removing material through agreed access routes and leaving common areas clean. **Q: What's a defit, and how is it different from an internal strip out?** A: A defit is an internal strip out done at the end of a commercial lease, scoped specifically to satisfy the make-good clause in the lease. All defits are strip outs; not all strip outs are defits. The technical work is the same — the difference is contractual: a defit's scope is dictated by your lease, not by what you'd choose to remove. **Q: Is rubbish removal included in a strip out?** A: Yes. Every full strip out we carry out includes complete debris removal. Rubbish and debris removal is also available as a stand-alone service when you have handled the demolition yourself and just need the mess gone. **Q: Does Strip It Out provide a written, fixed-scope quote?** A: Yes. Every Strip It Out internal strip out is quoted in writing with a fixed scope: a clear list of inclusions, what's not included, the timeframe, the waste-removal arrangement and the price. No "POA" line items, no variations sprung mid-job. Send through site photos and any drawings you have, and we'll return a quote, usually within 24 hours. **Q: Can you remove a load-bearing wall?** A: No. Removing a load-bearing wall is structural work that needs an engineer and a builder. Strip It Out removes non-structural internal walls and partitions, and we will tell you honestly if a wall is structural rather than take on work that is not ours. **Q: How do I know if a wall is structural?** A: We assess the wall before quoting. Signs a wall may be load-bearing include running perpendicular to the ceiling joists or sitting above a beam. If there is any doubt, we recommend an engineer's check before any removal. **Q: How much does it cost to remove a wall?** A: Wall removal is quoted on the size and construction of the wall, any wiring or plumbing inside it that needs relocating, and the patching required afterwards. We assess the wall and provide a clear, fixed-scope quote. **Q: Do you handle the wiring and plumbing inside the wall?** A: Yes. We coordinate licensed electricians and plumbers to relocate any wiring, power points, switches or pipework hidden in the wall before it is demolished, so the job is done safely and to code. **Q: How long does it take to remove an internal wall?** A: A single non-structural wall is often removed in a day, including debris removal. Multiple walls, or walls with services to relocate, take longer. We coordinate the trades so the whole job runs as one sequence. **Q: Do you remove office partitions?** A: Yes. We remove office partition systems, meeting-room walls and stud partitions as part of commercial fitout changes and defits, leaving a clean, open space ready for the new layout. **Q: What types of flooring can you remove?** A: We remove tiles and tile bedding, timber, bamboo, cork, vinyl, linoleum and carpet, and strip paint and epoxy coatings from concrete. We also grind the slab and prepare the subfloor so your new floor can go straight down. **Q: Do you prepare the slab after floor removal?** A: Yes. Once the old floor is up we grind off leftover adhesive, tile bedding and ridges to leave a flat, sound substrate ready for new tiles, vinyl, timber, carpet or a coating. **Q: Is floor removal dusty?** A: Lifting carpet or timber boards creates little dust. Tile removal and grinding off the adhesive create more, so that equipment runs with HEPA dust extraction and we seal off the work area. That keeps floor removal low-dust, and the work can usually go ahead in an occupied home or business. **Q: How long does floor removal take?** A: Most residential floors are lifted and prepped within a day or two. Carpet is often done in a few hours, while thick tile beds, direct-stick timber and large commercial floors take longer. **Q: Do you take the old flooring away?** A: Yes. All the old flooring, bedding, adhesive and debris are removed from site and disposed of, and the floor is left clean. ## Blog Posts (20) ### How to Remove Tile Adhesive and Tile Bed from a Concrete Slab URL: https://stripitout.com.au/blog/how-to-remove-tile-adhesive-from-concrete *Category: guide | Published: 25 November 2026* The tiles are only half the job. Here is how to get tile adhesive and bedding off a concrete slab, which method suits which floor, and when it is time to grind. Once the tiles are up, the adhesive or bedding left on the slab still has to come off before a new floor can go down. For a thin layer of tile adhesive over a small area, a floor scraper can do the job. For anything larger, diamond grinding with dust extraction is the fastest way back to sound, flat concrete, and a thick sand-and-cement bed has to be broken up or machine-stripped first. Chemical removers do little to cement-based adhesive. Whatever the method, the slab has to finish flat and clean, and the silica dust has to be controlled. This guide covers the cement-based adhesive and bedding left behind by ceramic, porcelain and stone tiles on a concrete slab. ## Thin-set adhesive or a sand-and-cement bed? Start by working out what you are dealing with, because it decides the method. - **Thin-set tile adhesive** is a cement-based adhesive spread a few millimetres thick with a notched trowel. It is common under newer floor tiles and most wall tiles, and it leaves ridges across the slab when the tiles come up. - **A sand-and-cement bed**, also called a mortar bed or screed, is a much thicker layer. Many floor tiles sit on one, and most older bathrooms do. It usually has to be broken up or machine-stripped rather than scraped by hand. Lift a tile at the edge of the room and look at the underside and the slab. If you can see trowel lines and a thin grey or white layer, it is thin-set. If the tile comes up with a thick, sandy layer of mortar attached, it is a bed. ## Your three options: scraping, chemicals or grinding ### Scraping A long-handled floor scraper, or a hammer and bolster, will take off adhesive that has already let go of the slab, and a powered chipping hammer speeds up small areas. Scraping suits a small room with a thin layer, but it rarely gets the slab completely clean. It tends to leave a skin of adhesive and the low ridges between the trowel lines, and those still have to be dealt with before the new floor goes down. On large areas, professional crews use ride-on and walk-behind scrapers to strip tile and bedding far faster than hand tools. ### Chemical adhesive removers Chemical removers are made for organic adhesives such as mastics and glues. Cement-based thin-set and mortar beds are not glue, so solvents do little to them, and acid-based products bring their own handling and disposal problems. Any chemical also leaves a residue on the slab that has to be cleaned off before a new adhesive or coating will bond. For tile adhesive on concrete, chemicals are rarely the right tool. ### Diamond grinding A floor grinder fitted with diamond tooling takes thin-set, leftover bedding, ridges and high spots back to sound concrete and leaves the slab flat in the same operation. It is the standard next step after tile removal on a concrete slab. Grinding without dust control is the dangerous part, though: the grinder has to be connected to an extractor with HEPA filtration, and the room should be sealed off from the rest of the building. | Method | Best for | Watch out for | |---|---|---| | Scraping | Small areas and thin adhesive that has already let go | Leaves a skin and ridges; slow by hand | | Chemical removers | Organic glues and mastics | Little effect on cement-based adhesive; residue to clean off | | Diamond grinding | Thin-set, bedding residue, ridges and high spots | Needs dust extraction with HEPA filtration | ## Why the slab has to be flat New flooring is only as good as the surface under it. Ridges of old adhesive and patches of bedding stop new tiles from bedding evenly, show through vinyl, and stop timber boards from lying flat. They also stop a new adhesive, membrane or coating from bonding properly to the concrete. Grinding gives the slab two things at once: a flat surface and a clean, open profile for the next product to grip. Coatings and some adhesives need a particular surface profile, described as a CSP (concrete surface profile) rating, usually CSP-1 to CSP-3 depending on the new flooring. Check what your flooring supplier or installer needs before the slab is prepared, so it is ground once and ground to the right finish. ## Keep the silica dust down Tile adhesive, tile bedding, grout and concrete all contain crystalline silica. Scraping, chipping or grinding them releases fine dust that can be breathed deep into the lungs, and long-term exposure causes silicosis, an irreversible lung disease. Australian workplace health and safety regulations limit silica exposure to 0.05 mg per cubic metre over 8 hours. That is why low-dust methods matter on this job more than most: - Connect a dust extractor with HEPA filtration directly to the grinder and to any chipping tools. - Seal the work area with plastic sheeting and tape, and cover doorways and vents. - Keep other people, children and pets out of the area until the clean-up is finished. - Clean up with a HEPA vacuum, never by dry sweeping, which just puts the fine dust back into the air. - Wear a fitted P2 or P3 respirator, not a paper dust mask. For more on the health side, read our guide to [silicosis and silica dust](/blog/silicosis-dust-what-you-need-to-know). ## How long it takes With the right equipment, a typical residential floor is ground and prepped in a day, and a single bathroom or small floor is often stripped of tile and adhesive in a day as well. A thick mortar bed, a large open-plan area or a commercial floor takes longer, mostly because of the volume of heavy waste that has to be broken up and carried out. By hand, the same job takes several times as long, and the slab is rarely as flat at the end of it. ## Can you do it yourself? A small area of thin-set that is already coming away can be a weekend job with a scraper, a respirator and a lot of patience. If the building dates from before 1990, have the tiles, the adhesive and any sheeting behind them tested before you scrape or grind; our [internal strip out](/services/internal-strip-out) page explains the Queensland rules for older buildings. Hiring a floor grinder is a different matter. The machine is heavy, the dust is the real hazard, and a hire grinder is only as safe as the extractor connected to it. A slab that is gouged or left uneven by an inexperienced operator then needs patching or levelling before the new floor can go down. If you do take it on, work in small sections and keep the extractor running the whole time. If the adhesive will not come away without heavy force, it is probably a bed rather than thin-set, and it needs breaking up first. ## When to call in a professional Bring in a contractor when: - the area is larger than a small room - the building was built before 1990 - the tiles were laid on a thick sand-and-cement bed - the home or business stays occupied while the work is done - the new floor needs a flat, clean slab with a particular surface profile - you want the tiles, bedding and adhesive removed and the slab ground as one job Strip It Out removes the tiles, the bedding and the adhesive, then grinds the slab flat, with HEPA dust extraction connected to our equipment and the work area sealed off. See our [tile removal](/services/tile-removal) and [concrete grinding](/services/concrete-grinding) services for how we work, or our step-by-step guide to [how professional tile removal works](/blog/how-do-you-remove-tile). ## Get a free quote Send us photos of the floor, the room sizes and what is going down next, and we will give you a free, fixed-scope quote. Call 0430 030 633 or [contact us](/contact) online. We work across the Gold Coast and Brisbane. --- ### Internal Strip Out vs Demolition vs Defit: An Australian Plain-English Guide URL: https://stripitout.com.au/blog/internal-strip-out-vs-demolition-defit *Category: guide | Published: 20 May 2026* Strip out, internal demolition, soft strip, defit, make-good — Australian construction uses these terms interchangeably, but they mean different things. Here's how to tell which one your job actually is, and why it matters for licensing and price. Australian construction throws around half a dozen terms that mean different things to different people. "Strip out", "internal demolition", "soft strip", "defit", "make-good" — they overlap, they're used interchangeably in casual conversation, and they get clients quoted for the wrong thing. This guide untangles them in plain English so you know exactly what you're hiring (and what you should be paying for). ## The short version - **Strip out / internal strip out / soft strip / internal demolition** — all the same thing. Removal of everything inside a building that isn't structural. - **Full demolition** (hard demolition) — removal of the entire building including structural walls, floors and roof. Different licence, different scope. - **Defit** — a strip out done at the *end of a commercial lease*, to satisfy the make-good clause. - **Make-good** — the *legal obligation* in the lease, not the activity. The activity that achieves it is the defit. - **Dilapidation** — a *condition report*, not an activity. A document used to manage risk. If you only read this section, you've got the essentials. Read on for the practical distinctions that change what you pay and what your contractor needs to be licensed for. ## Internal strip out: what's actually removed An internal strip out — also called interior demolition, soft strip or soft strip demolition — is the systematic removal of every non-structural element from inside a building. The structural shell — load-bearing walls, columns, slabs, the roof — stays untouched. ![Stripped corridor with wall framing exposed and linings removed](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955148/stripped_corridor_wall_framing_ee2d4b7c5b.jpg#w=1050&h=1400 "A corridor we stripped back to its wall framing, with linings and finishes removed.") In practice that means: - Non-structural partition walls - Suspended ceilings and bulkheads - Floor coverings (tiles, carpet, vinyl, timber) and the substrate beneath - Joinery, cabinetry, benchtops, shopfronts - Fixtures, lighting, plumbing fittings, switchboards - Mechanical fit-out (ducting, grilles) - Services *fit-out* (cables, conduit, pipes within non-structural elements) — but only after the *mains* have been isolated by a licensed electrician, plumber or gas fitter What's *not* removed: structural walls, slab, roof, external walls and the mains for utilities. The contractor will not disconnect mains services — that's regulated trade work that has to happen before the strip-out crew arrives. This is the scope for a renovation, a [commercial defit](/services/commercial-strip-out), a pre-demolition clearance or a pre-sale clean-up. ## Soft strip vs internal strip out These are the same activity under different names. "Soft strip" is the technical term used by architects, principal contractors and project managers — borrowed from UK construction usage. "Internal strip out" is the term most Australian clients search for. "Internal demolition" is the same thing again, from the regulatory side. When you read a tender document or an architect's spec, you'll see "soft strip". When you Google for a contractor, you'll search "internal strip out". They mean the same job. ## Internal strip out vs full demolition This is the most important distinction in licensing and price. ![Ceiling grid, ducting and lighting exposed above a large open floor](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955149/ceiling_grid_exposed_024fb183a3.jpg#w=1390&h=1044 "Ceiling grid and services left exposed in a large internal strip out. The building structure stays in place.") - An **internal strip out** removes non-structural elements only. The building still stands afterwards. In Queensland, work over $3,300 requires a QBCC contractor licence; a WorkSafe QLD demolition work licence is usually *not* required for pure interior soft strip. - A **full demolition** (hard demolition) removes the entire structure, including load-bearing walls and the roof. It requires a separate WorkSafe QLD demolition work licence, engineering design for any temporary works, site hoarding, a council demolition permit and 5-day WHSQ notification. A strip out often *precedes* a full demolition — clearing the interior is done first because it lets you salvage and separate waste at much higher rates, and it makes the structural demolition stage safer. But they are two distinct scopes, priced and licensed differently. If a contractor proposes to do both under one quote, ask them to break it out so you can see what licence covers what. ## Internal strip out vs defit A **defit** is a strip out, done at a specific time, to satisfy a specific contract. Specifically: a defit is the strip out conducted at the **end of a commercial lease**, scoped to the **make-good clause** in that lease. Every defit is a strip out. Not every strip out is a defit. If you're renovating your own building, that's a strip out — not a defit. If you're a tenant clearing out before lease end, that's a defit. For shops and offices, see our [shop and office defit](/services/shop-office-strip-out) service. The practical difference is mostly contractual. A defit's scope isn't decided by what *you* want removed — it's decided by what your *lease* says you need to hand back. Some leases require base-building condition (a bare shell). Some require you to remove only your own tenant-installed improvements. Some require patching, painting and reinstatement of removed services. Read the make-good clause carefully — or ask the contractor to scope to it. ## Make-good vs defit This trips people up constantly. **Make-good** is not the activity — it's the *obligation*. It's a clause in your commercial lease that defines the condition you must return the premises in. **Defit** is the *activity* that achieves the make-good. Your make-good clause might require: - Removal of all tenant-installed fit-out - Patching and painting of walls and ceilings - Reinstatement of services (e.g. lighting, suspended ceiling grid) to base-build condition - Floor covering restoration - Removal of signage and branding A good defit quote scopes precisely to your make-good clause — neither under-delivering (which leaves you exposed at handover) nor over-delivering (which costs you money you didn't owe). Bring the lease to the inspection. If the contractor doesn't ask to see it, that's a warning sign. ## What about dilapidation? **Dilapidation** is not work — it's a *report*. Specifically, a photographic and written record of the condition of a building (and often the adjacent properties) *before* strip-out work begins. It documents what's there, so any damage that happens during the works can be attributed correctly. It's not legally mandatory for a small strip out, but it's strongly recommended for: - Strata buildings (apartments, units, townhouses) - Semi-detached or shared-wall buildings - Heritage-overlay properties - Anything where damage to neighbours' property would be expensive to argue about A dilapidation report is cheap insurance. Ask your contractor whether they recommend one before the job starts. ## Pre-demolition strip out vs deconstruction Some contractors distinguish between a "strip out before demolition" (where you clear out the interior to enable safer, lower-cost demolition of the shell) and "deconstruction" (where you systematically dismantle a building to maximise material recovery for re-use rather than recycling). In Australia the terms aren't formally separated, but the distinction matters environmentally: full deconstruction can achieve over 90% landfill diversion. A standard internal strip out with on-site sorting typically achieves the national average for C&D waste — Australia's overall construction and demolition recovery rate is **84%** (DCCEEW National Waste Report 2024). The difference is mostly about how aggressive the material-separation process is and whether there's a buyer for the salvaged materials. ## Choosing the right term for your job The simplest mapping: - Renovating your own house? → **[residential strip out](/services/residential-strip-out)** - Commercial tenant clearing for lease end? → **defit** (scoped to your make-good clause) - Clearing interior before demolishing the building? → **pre-demolition strip out** - Restoring a tenancy to base-building condition for a new tenant? → **defit / make-good** - Architects or principal contractor talking? → they'll say **soft strip** If you're unsure which applies, the scope of work and the regulatory requirements are the same in all cases: an internal strip out, governed by Queensland's WHS framework, requiring a QBCC-licensed contractor for any job over $3,300. For the full technical detail on what an internal strip out covers, the Queensland regulatory framework, silica and asbestos rules, what to expect on the day and how to vet a contractor, see our [internal strip out service page](/services/internal-strip-out). ## Get a quote — without picking the wrong term You don't need to use the right term to get the right quote. Tell Strip It Out what you need cleared, when, and from where — and we'll scope it to the correct definition, the correct licensing and the correct waste handling. Free fixed-scope written quotes for the Gold Coast, Brisbane and South East Queensland. [Contact us](/contact). --- ### How Much Does a Strip-Out Cost? A Gold Coast & Brisbane Guide URL: https://stripitout.com.au/blog/how-much-does-a-strip-out-cost *Category: guide | Published: 18 May 2026* A strip-out is quoted job by job; there is no flat rate. Here is exactly what goes into a strip-out quote, the seven factors that change the price, and how to budget for your Gold Coast or Brisbane renovation. There is no single price for a strip-out. It is quoted job by job, because the cost depends on what is being removed, how big the space is, how easy it is to access, and how much waste comes out. This guide explains exactly what goes into a strip-out quote so you can budget realistically and compare quotes properly, whether you are renovating a single bathroom or fitting out a commercial tenancy on the Gold Coast or Brisbane. ## What a strip-out actually includes A strip-out (also called internal demolition, or a defit or make-good for commercial spaces) is the removal of the non-structural parts of a building so a renovation or new fit-out can begin. A typical quote covers: ![Wall framing and services exposed on a stripped back floor](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955146/stripped_back_framing_services_b10641ec28.jpg#w=1400&h=1050 "Wall framing and services left exposed after we remove the linings and ceiling.") - Removal of fixtures, fittings, cabinetry and joinery - Tile, floor covering and substrate removal - Wall and ceiling lining removal where specified - Non-structural wall removal where required - Loading, hauling and **responsible disposal of all waste** - A clean, trade-ready hand-over Two strip-outs that sound the same, "just a bathroom", can be priced very differently depending on the points below. That is normal, and it is why a fixed-scope written quote matters. ## How strip-outs are priced Most residential strip-outs are quoted as a **fixed price for the job**, set after a site assessment or a review of photos and plans. Some elements are commonly priced **per square metre**, particularly [tile removal](/services/tile-removal), [concrete grinding](/services/concrete-grinding) and large floor-covering removals, because the work scales directly with area. Commercial strip-outs and defits are usually quoted on **floor area and scope**, against the make-good clause in the lease. The key point: a credible quote is **fixed-scope and itemised**, so you know exactly what is included before work starts. ## What changes the price: the seven main factors Seven things move a strip-out quote up or down: 1. **Size of the space** — floor area and ceiling height. More to remove means more hours and more waste. 2. **What is being removed** — a fixture-only strip is quick; one that also includes tiles, tile bedding, wall linings and substrate grinding is a much bigger job. 3. **Tiling** — tiles laid on a thick sand-and-cement bed take far longer to remove than thin-set tiles, and the substrate often needs grinding afterward. 4. **Access** — ground floor with a driveway is straightforward; an upper storey, a high-rise unit needing a lift booking, or a tight inner-city site adds time and handling. 5. **Waste volume and type** — disposal is a real cost and it rises with volume. 6. **Hidden conditions** — older homes hide surprises behind walls and under floors; a good contractor flags this honestly up front. 7. **Timeframe and hours** — standard hours are cheaper than after-hours or weekend work, which commercial jobs often need to hit a handover date. ## A note on asbestos and hazardous materials In homes built or renovated before the late 1980s, materials such as fibre-cement sheeting may contain asbestos. If suspect material is present it must be identified and handled by a licensed asbestos removalist; this is a separate, regulated scope and is **not** part of a standard strip-out price. A reputable contractor will pause and advise you rather than disturb suspect material. Budget for an inspection if your property is older. ## Typical timeframes Timeframes are easier to pin down than price, and they give a good sense of the scale of each job: - **[Bathroom strip-out](/services/bathroom-demolition):** usually 1 to 2 days - **[Kitchen strip-out](/services/kitchen-demolition):** often a single day - **Full-home or pre-renovation strip-out:** several days to a week, depending on size - **[Commercial strip-out or defit](/services/shop-office-strip-out):** a small office or shop is often 1 to 3 days; larger tenancies are staged around the handover date ## Why the cheapest quote is rarely the cheapest job A very low quote usually means something has been left out: waste disposal, substrate preparation, wall make-good, or a realistic allowance for the tile bed. Those gaps reappear as variations mid-job, or as extra cost for the next trade who has to fix a rushed strip-out. When you compare quotes, check that each one is **fixed-scope**, states **what is and is not included**, and clearly covers **rubbish removal and a trade-ready finish**. A slightly higher quote that is genuinely complete is almost always the cheaper outcome. ## How to get an accurate number The only accurate strip-out cost is one quoted against your actual space. To get a reliable quote: - Provide clear photos of every area, and plans if you have them - Be specific about what stays and what goes - Mention the property's age and any known issues - Ask for the quote in writing, fixed-scope and itemised Strip It Out provides **free, fixed-scope written quotes** for residential and commercial strip-outs across the Gold Coast and Brisbane. [Get in touch](/contact) with photos of your project and we will give you a clear, no-obligation price, and an honest timeline to match. --- ### Silica Dust and Home Renovations: A Gold Coast & Brisbane Guide URL: https://stripitout.com.au/blog/silica-dust-home-renovations *Category: safety | Published: 18 May 2026* Cutting, grinding or demolishing tiles, concrete and masonry releases respirable crystalline silica, a dust linked to silicosis and lung cancer. Here is what Gold Coast and Brisbane homeowners need to know before a renovation. Cutting, grinding, drilling or demolishing materials like tiles, concrete, bricks and mortar releases **respirable crystalline silica**, an extremely fine dust that, breathed in over time, can cause silicosis, lung cancer and other serious illness. For Gold Coast and Brisbane homeowners planning a renovation, the dusty demolition stage is the highest-risk part of the job, and the part most worth handing to a crew that controls it properly. This guide explains what silica dust is, where it hides in a typical Queensland home, why the rules around it changed in 2024, and what you should do before your renovation starts. ## What is silica dust? Crystalline silica is a natural mineral found in many common building materials. On its own, sitting in a solid benchtop or a tiled floor, it is harmless. The danger appears when those materials are **cut, ground, sanded or smashed**, throwing up a cloud of microscopic dust particles. The finest of these, *respirable* crystalline silica, are small enough to travel deep into the lungs, where the body cannot clear them. You cannot see the most dangerous particles, and you will not always smell or taste them. A renovation site can look "mostly clear" while the air is still carrying a hazardous load. ## Where silica hides in a typical home More of your house contains silica than most people expect. During a strip-out or demolition, silica dust commonly comes from: - **Floor and wall tiles**, and the sand-and-cement bed they are laid on - **Concrete** slabs, footings and besser block - **Bricks, mortar and render** - **Natural and engineered stone** benchtops - **Fibre-cement sheeting** (common in older bathrooms, eaves and walls) - **Tile adhesive, grout and screed** This is why **tile removal, concrete grinding and bathroom demolition** are the dustiest jobs in any renovation: they disturb exactly the materials that contain the most silica. ## Why the rules changed in 2024 Australia tightened its approach to silica significantly in 2024. From **1 July 2024**, Australia became the first country in the world to **ban the manufacture, supply, processing and installation of engineered stone** benchtops, panels and slabs, in response to the silicosis epidemic among stonemasons. Then from **1 September 2024**, stronger nationwide rules took effect for **all crystalline silica work**, not just engineered stone, introducing the category of "high-risk crystalline silica work" and requiring proper risk control. For tradespeople, dust control is now a legal obligation, not an optional extra. For homeowners, it is a useful signal: **any contractor still creating clouds of dry dust with an angle grinder is working to a standard the industry has moved on from.** ## The risk during a home renovation As a homeowner you are not a "worker" on your own site, but a renovation still exposes you, your family and your neighbours, especially if the home is occupied during the work, or if you are tempted to do the demolition yourself. Silica-related disease is **cumulative and irreversible**. Silicosis scars the lungs permanently and has no cure. The risk is highest for people doing this work repeatedly without protection, but a single badly managed demolition that fills a house with dust is not something any family should breathe, and that dust settles into carpets, wall cavities and air-conditioning for weeks afterward. This is the core reason DIY demolition is a false economy: the saving is small, and the dust exposure, and the clean-up, are very real. ## How a professional crew controls silica dust A properly equipped strip-out crew treats dust as the main hazard of the job and plans around it. The controls that matter: ![Fine dust across the floor of a commercial space during strip out work](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955145/dusty_floor_strip_out_06e5974cab.jpg#w=787&h=1400 "Fine dust settled across the floor during a strip out, which is why we extract at the source.") - **Water suppression** — wetting materials as they are cut stops dust becoming airborne in the first place. - **On-tool extraction with H-class HEPA vacuums** — capturing dust at the source, as it is generated. - **Sealing and containment** — plastic barriers and taped-off zones stop dust migrating into the rest of the home. - **Respiratory protection (P2 masks)** for everyone on site. - **Proper clean-up** — HEPA vacuuming, never dry sweeping, which just re-suspends the dust. At Strip It Out we run low-dust [tile removal](/services/tile-removal), dust-controlled [concrete grinding](/services/concrete-grinding) and HEPA-extracted [bathroom demolition](/services/bathroom-demolition) as standard, because keeping silica out of the air is the difference between a renovation you can live next to and one you cannot. ## What homeowners should do before a renovation starts A short checklist before the demolition stage begins: 1. **Ask your contractor how they control dust.** "Water and HEPA extraction" is the answer you want; vague answers are a red flag. 2. **Do not do the tile or concrete demolition yourself.** It is the single dustiest task and the one most worth paying a professional for. 3. **Vacate the work zone.** Keep family, especially children and anyone with a respiratory condition, out of the area while demolition is underway. 4. **Seal off the rest of the house.** A good crew does this as standard; confirm it is part of the plan. 5. **Expect a proper clean-up**, with HEPA vacuuming rather than dry sweeping. 6. **Give neighbours a heads-up** if you share walls or live in a unit or townhouse. ## The bottom line Silica dust is the most serious hazard in a home renovation, and it comes from the most ordinary materials: tiles, concrete and brick. The 2024 law changes made dust control a baseline expectation, not a premium. When you hire for a strip-out or demolition on the Gold Coast or Brisbane, choosing a crew that genuinely controls silica dust protects your family's health, your home, and everyone working on it. Planning a renovation? [Contact Strip It Out](/contact) for a free, fixed-scope quote on low-dust strip-out and demolition. --- ### How to Quote Demolition Jobs: Trade Insights on Waste & Labour URL: https://stripitout.com.au/blog/how-to-quote-demolition-jobs *Category: industry | Published: 5 May 2026* Accurate demolition quotes balance labour hours, equipment, waste volume and disposal fees. How Gold Coast and Brisbane crews calculate fixed pricing. Accurate demolition quoting balances four cost drivers: labour hours, equipment time, waste volume, and disposal fees. Professional Gold Coast and Brisbane strip out crews use square metre rates for standard work, then add line items for variables like access difficulty, asbestos risk and substrate grinding. A reliable fixed-scope quote should itemise each component so the client and contractor agree on exactly what is included before work starts. ## The Four Cost Drivers ### 1. Labour Hours Labour is typically the largest cost component: - Crew rate: AUD 80 to 150 per hour per worker - Typical small job crew: 2 workers - Typical commercial defit crew: 3 to 6 workers A 4-hour bathroom demo with 2 workers represents AUD 640 to 1,200 in labour alone. ### 2. Equipment Time Specialised equipment is costed by hour or day: ![Grinders, extractors and a tool case staged in an empty commercial space](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955143/demolition_equipment_staged_be9d63d056.jpg#w=924&h=944 "Our grinders, extractors and tools staged and ready. Equipment time is a cost driver in its own right.") | Equipment | Hire/Use Rate | |---|---| | Diamond grinder | AUD 200 to 400 per day | | Ride-on scraper | AUD 400 to 700 per day | | Chipping hammer with extraction | AUD 100 to 200 per day | | HEPA industrial vacuum | AUD 100 to 200 per day | | Skip bin (4 cubic metre) | AUD 350 to 500 | | Skip bin (8 cubic metre) | AUD 600 to 900 | ### 3. Waste Volume Estimate waste in cubic metres: | Job Type | Typical Waste Volume | |---|---| | Small ensuite | 1 to 2 cubic metres | | Family bathroom | 2 to 4 cubic metres | | Kitchen | 2 to 5 cubic metres | | Single room (40 sqm) flooring removal | 1 to 3 cubic metres | | Full house strip out | 8 to 20 cubic metres | | Commercial floor (300 sqm) | 10 to 25 cubic metres | ### 4. Disposal Fees Queensland disposal levies as of 2026: - General construction waste: AUD 75 to 105 per tonne - Mixed waste: AUD 90 to 120 per tonne - Asbestos: AUD 200 to 400 per tonne plus handling Always check current rates with your local waste facility. ## Square Metre Rates by Service Type Industry-standard pricing on the Gold Coast and Brisbane: | Service | Rate per sqm | |---|---| | Carpet removal | AUD 8 to 15 | | Vinyl removal with adhesive | AUD 15 to 30 | | Timber/bamboo floor removal | AUD 25 to 45 | | Tile removal (residential) | AUD 30 to 60 | | Tile removal (commercial heavy) | AUD 40 to 80 | | Concrete grinding (light) | AUD 25 to 45 | | Concrete grinding (epoxy/heavy) | AUD 40 to 80 | | Wall lining removal | AUD 20 to 40 | | Ceiling lining removal | AUD 25 to 50 | ## Comparison: Quoting Approaches | Approach | Pros | Cons | |---|---|---| | Hourly rate | Flexible | Risk of scope creep, surprise costs | | Square metre rate | Predictable per area | Doesn't account for unique conditions | | Fixed-scope itemised | Clear, no surprises | Requires thorough site assessment | | Cost-plus | Transparent | Requires trust and documentation | The fixed-scope itemised approach is best for client-contractor relationships and accuracy. ## The Itemised Quote Format A professional quote should include: 1. Site address and contact details 2. Scope of works (each task as separate line item) 3. Square metre measurements for each component 4. Quantity of fixtures or items removed 5. Labour hours estimate 6. Equipment included 7. Waste disposal included 8. Exclusions (clearly listed) 9. Variations process (how changes are handled) 10. Payment terms 11. Insurance certificates available on request 12. Validity period (usually 30 days) ## Common Quoting Mistakes ### Underestimating Substrate Issues Multi-layer flooring, thick mortar bedding, or hidden adhesive can double the time on the floor portion. Always inspect cores or get photos before quoting blind. ### Skipping Asbestos Risk Pricing Pre-1990 homes have asbestos potential. Either include "asbestos testing AUD 350 if required" or quote contingent on no asbestos. ### Forgetting Access Time Small lifts, tight stairs, parking issues add 10 to 30 percent labour time. Include site assessment access notes in the quote. ### Underpricing Disposal Disposal levies have increased significantly. Use current rates, not historical estimates. ### No Contingency for Hidden Issues Add 5 to 10 percent contingency to absorb minor unknowns. Larger surprises (structural damage, asbestos) trigger variations. ## Sample Bathroom Demolition Quote Structure **SCOPE:** - Remove all fixtures (vanity, toilet, shower, bath, tapware): AUD 350 - Remove wall tiles and bedding (12 sqm at AUD 50/sqm): AUD 600 - Remove floor tiles and bedding (6 sqm at AUD 60/sqm): AUD 360 - Remove existing waterproofing membrane: AUD 150 - Concrete grinding for substrate prep: AUD 280 - Skip bin and waste disposal (4 cubic metres): AUD 450 - HEPA vacuum and final clean: included - Site protection and containment: included **SUBTOTAL:** AUD 2,190 **GST:** AUD 219 **TOTAL:** AUD 2,409 **EXCLUDES:** - Plumbing isolation (separate licensed trade) - Electrical isolation (separate licensed trade) - Asbestos testing or removal (if discovered) **TIMELINE:** 1 day **START DATE:** confirmed within 24 hours of acceptance **PAYMENT:** 30% deposit, balance on completion ## Why This Matters for Clients When you receive a vague single-line quote like "Bathroom demolition: AUD 2,000" you have no way to: - Compare with another quote - Identify what's missing - Negotiate specific items - Hold the contractor to scope Always request itemised quotes. Reputable contractors provide them on request. ## Get a Detailed Itemised Quote Strip It Out provides itemised, fixed-scope quotes for every Gold Coast and Brisbane project. Send photos and dimensions for a same-day quote. Call 0430 030 633. --- ### How Long to Demo a Small Bathroom? The One-Day Reality URL: https://stripitout.com.au/blog/how-long-to-demo-small-bathroom *Category: tips | Published: 5 May 2026* A professional crew can demo a small bathroom in a single day. DIY takes 3 to 5 days. Here is the realistic timeline and what makes the difference. A small [bathroom demolition](/services/bathroom-demolition) takes professionals 6 to 8 hours (one work day) including fixture removal, tile and bedding removal, wall lining removal where specified, concrete grinding and final clean-up. DIY removal of the same scope typically takes 3 to 5 days. The time difference comes down to professional equipment: ride-on scrapers for adhesive, diamond grinders for substrate prep, HEPA vacuums for cleanup, and chipping hammers with dust extraction. For Gold Coast and Brisbane homeowners, a one-day strip out means the waterproofer can start the next morning. ## Hourly Breakdown of a Small Bathroom Demo A 4 to 6 square metre ensuite typically follows this schedule: | Hour | Task | |---|---| | 0:00 to 1:00 | Site setup, plastic containment, equipment connection | | 1:00 to 2:30 | Fixture removal (vanity, toilet, shower screen, bath) | | 2:30 to 4:30 | Wall tile removal with bedding | | 4:30 to 6:00 | Floor tile and bedding removal | | 6:00 to 7:00 | Concrete grinding for substrate prep | | 7:00 to 8:00 | HEPA vacuum, waste removal, final clean | Most small bathrooms are completely strip-out finished by mid-afternoon. ## What Makes Professional Crews 5x Faster ### 1. Ride-On Scrapers Lift carpet, vinyl and timber adhesive at 50 to 100 square metres per hour versus 5 square metres per hour by hand. ### 2. Electric Chipping Hammers with Dust Shrouds Lift tiles and bedding together in one operation. Dust shrouds keep the area clean. ### 3. Diamond Grinders Smooth concrete substrate in 15 to 30 minutes per square metre versus several hours of hand chiselling. ### 4. HEPA Industrial Vacuums Cleanup in 30 minutes versus full-day DIY mopping and re-vacuuming. ### 5. Dual-Crew Workflow Two team members working simultaneously: one chipping, one disposing. ## Comparison: DIY vs Professional Small Bathroom Demo | Task | DIY Time | Professional Time | |---|---|---| | Setup and containment | 1 to 2 hours | 1 hour | | Fixture removal | 3 to 5 hours | 1.5 hours | | Wall tile removal | 8 to 16 hours | 2 hours | | Floor tile removal | 6 to 12 hours | 1.5 hours | | Bedding removal | 4 to 8 hours | Combined with above | | Substrate grinding | 4 to 8 hours | 1 hour | | Cleanup | 3 to 6 hours | 1 hour | | **Total** | **29 to 57 hours** | **6 to 8 hours** | The professional crew is typically 5 to 7 times faster for the same finished result. ## What Can Slow a Small Bathroom Demo Even professionals encounter delays: 1. Asbestos discovery (work stops; licensed removalist required) 2. Hidden plumbing changes (service rerouting needed) 3. Structural issues (load-bearing wall vs partition unclear) 4. Unexpected concrete thickness 5. Multi-layer flooring history 6. Restricted access (small lifts, tight stairwells) A reputable contractor flags these on the site visit before quoting. ## What Cannot Be Rushed Some steps must be done correctly regardless of pace: 1. Service isolation (plumbing, electrical, gas) by licensed trades 2. Asbestos sampling if pre-1990 home 3. Substrate inspection for hidden damage 4. Waterproofing membrane preparation Skipping these creates problems for the renovation that follows. ## After the Demo: When Can the Next Trade Start A clean handover from your strip out crew means: - Day 1 (today): Demolition complete - Day 2 (tomorrow): Waterproofer can start - Day 4: Tiler can start (after waterproofing cure) - Day 7 to 14: Bathroom complete Compare with DIY: - Days 1 to 5: DIY demolition - Day 6: Re-clean substrate (often needed) - Day 7: Waterproofer starts - Day 9: Tiler starts - Days 14 to 21: Bathroom complete DIY adds approximately 1 week to the total renovation timeline. ## Why Speed Matters Beyond convenience: 1. Fewer days of bathroom unavailability 2. Less stress for occupants 3. Lower hotel costs if living elsewhere 4. Shorter project insurance window 5. Faster return to property value ## Get a Same-Day Quote Strip It Out provides bathroom strip outs across the Gold Coast and Brisbane, typically completing small bathrooms in a single day. Send photos and dimensions for a same-day quote. Call 0430 030 633. --- ### What Is Soft Strip Demolition? The Guide to Commercial Defits URL: https://stripitout.com.au/blog/what-is-soft-strip-demolition *Category: guide | Published: 5 May 2026* Soft strip demolition removes all non-structural elements from a commercial building, leaving the shell. Also called a defit or make-good. Soft strip demolition is the systematic removal of all non-structural elements from a commercial building, leaving only the structural shell intact. It is also known as a [defit or make-good](/services/shop-office-strip-out) in Australian commercial real estate. Soft strip covers internal walls, ceilings, flooring, fixtures, fittings, services and finishes. Hard demolition (removing structural elements) is a separate scope. Most commercial lease end-of-lease make-goods on the Gold Coast and Brisbane fall under soft strip demolition. ## What Soft Strip Demolition Covers A complete soft strip removes: 1. Non-structural internal walls (plasterboard, partitions) 2. Suspended ceiling tiles, grid systems and plenum infrastructure 3. All flooring (carpet, vinyl, tiles, timber, concrete coatings) 4. Fixtures and fittings (cabinetry, joinery, signage) 5. Mechanical services to landlord-specified state 6. Electrical fittings (lighting, GPOs, data) 7. Plumbing fixtures (basins, taps, toilets) 8. Branded surfaces and finishes 9. Furniture, partitions and screens Structural elements (load-bearing walls, columns, slabs, roof structure) remain in place. ## What Soft Strip Does Not Cover Soft strip is distinct from: - **Hard demolition**: removing structural walls, slabs, roofs - **Civil demolition**: external pavements, foundations - **Hazardous demolition**: asbestos, lead paint, contaminated materials (handled by licensed specialists) - **Structural alterations**: cutting new openings, installing new beams These typically require separate scopes and licensed structural demolition contractors. ## Why Soft Strip Is Required at Lease End Commercial leases include "make-good" or "reinstatement" clauses requiring tenants to return the premises to: 1. Original condition (before fitout) 2. Base building condition 3. A specific condition outlined in the lease A soft strip is the practical execution of these clauses. Common triggers: - End of fixed-term lease - Tenant relocation - Building sale or change of use - Insurance claim post-damage - Major refurbishment by landlord ## Comparison: Make-Good Conditions | Condition | Scope | Typical Cost | |---|---|---| | Cosmetic make-good | Repaint, recarpet, repair holes | AUD 50 to 150 per sqm | | Standard make-good | Remove tenant fitout, return to base | AUD 100 to 300 per sqm | | Full base building | Complete soft strip including services | AUD 200 to 500 per sqm | | Shell and core | Soft strip plus partition removal | AUD 300 to 700 per sqm | Always check your lease wording carefully. Some leases require specific finishes (e.g. carpet grade, paint colour). ## The Soft Strip Process Professional [commercial defit](/services/commercial-strip-out) follows this sequence: ### Step 1: Site Walk and Scope Confirmation Walk the site with the property manager or landlord. Confirm: - Exact scope of removal - Handover condition required - Timeline and access hours - Skip bin location and disposal route - Coordination with other trades ### Step 2: Service Isolation Licensed trades isolate: - Electrical (electrician disconnects fittings, caps wiring) - Plumbing (plumber caps water, removes fixtures) - Mechanical (HVAC isolated and protected) - Data and comms (cables removed or capped) ### Step 3: Demolition Works Systematic removal in this order: ![Timber wall and ceiling framing exposed after linings were removed](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955141/soft_strip_exposed_framing_eb7f19b635.jpg#w=1050&h=1400 "Timber framing exposed once our team has taken out the ceiling and wall linings.") 1. Furniture and loose items 2. Fixtures and fittings 3. Ceiling tiles and grid 4. Wall partitions and linings 5. Flooring 6. Final clean-up ### Step 4: Waste Disposal All waste segregated: - Recyclable metals (steel framing, aluminium) - Plasterboard (recycling where available) - General waste - Hazardous materials (separate licensed disposal) ### Step 5: Handover Final inspection with the property manager or landlord, signed off as complete. ## Typical Commercial Soft Strip Timeline | Floor Area | Duration | |---|---| | Small office (under 100 sqm) | 1 to 2 days | | Standard tenancy (100 to 300 sqm) | 3 to 5 days | | Large floor (500 to 1000 sqm) | 1 to 2 weeks | | Full building floor (1000+ sqm) | 2 to 4 weeks | ## What Affects Soft Strip Cost 1. Floor area and ceiling height 2. Density of partitions and fixtures 3. Floor level and lift access 4. Time of day (after hours costs more) 5. Disposal volume 6. Asbestos or hazardous material handling 7. Coordination with other trades ## Why Choose a Professional Defit Contractor Soft strip demolition requires: - Public liability insurance (typically AUD 20 million) - Workers compensation - Workplace health and safety management - Coordination with multiple licensed trades - Knowledge of building services - Waste management compliance Strip It Out provides commercial soft strip and defit services across the Gold Coast and Brisbane. We coordinate with property managers, licensed trades and waste contractors to deliver on-time handover. Call 0430 030 633 for a free site assessment. --- ### How Much Does Bathroom Demolition Cost? Pricing for Precision URL: https://stripitout.com.au/blog/bathroom-demolition-cost *Category: tips | Published: 5 May 2026* Bathroom demolition on the Gold Coast and Brisbane costs AUD 1,500 to AUD 4,500 depending on size, tile type and access. Free fixed-scope quotes today. [Bathroom demolition](/services/bathroom-demolition) costs on the Gold Coast and Brisbane typically range from AUD 1,500 for a small ensuite to AUD 4,500 for a large family bathroom. Professional pricing covers fixture removal, tile and bedding removal, wall and ceiling lining removal where specified, concrete grinding, and waste disposal. The biggest cost variables are size, tile thickness, access, and whether you need full strip-out to studs or only fixtures and finishes. ## Bathroom Demolition Cost Breakdown A typical bathroom strip out includes these line items: | Component | Cost Range | |---|---| | Fixture removal (vanity, toilet, shower, bath) | AUD 200 to 500 | | Wall tile removal with bedding | AUD 400 to 1,200 | | Floor tile removal with bedding | AUD 300 to 900 | | Wall lining removal (where specified) | AUD 200 to 600 | | Ceiling lining removal | AUD 150 to 400 | | Concrete grinding | AUD 200 to 600 | | Waste disposal and skip bin | AUD 250 to 500 | | Final clean-up | Included | | **Total** | **AUD 1,700 to 4,700** | Most residential bathrooms fall in the AUD 1,800 to 3,500 range. ## What Drives Bathroom Demolition Cost ### Size Bathroom area is the primary cost driver: | Size | Typical Cost | |---|---| | Powder room (under 4 sqm) | AUD 1,200 to 2,000 | | Small ensuite (4 to 6 sqm) | AUD 1,500 to 2,500 | | Standard bathroom (6 to 10 sqm) | AUD 2,000 to 3,500 | | Large family bathroom (10 sqm+) | AUD 2,800 to 4,500 | ### Tile Type and Thickness Heavy porcelain tiles on thick mortar bedding take 50 to 100 percent longer than thin ceramic on adhesive (see our [tile removal](/services/tile-removal) page for what affects tile removal pricing). Add AUD 200 to 500 for porcelain or stone tiles. ### Access | Access Type | Adjustment | |---|---| | Ground floor easy access | Standard | | Second storey, internal stairs | +AUD 200 to 400 | | Apartment with lift | +AUD 100 to 300 | | Apartment without lift | +AUD 300 to 600 | ### Concrete Grinding Required If your floor substrate has thick adhesive or mortar that needs grinding back, add AUD 200 to 600 depending on area. ### Asbestos Risk (Pre-1990 Homes) Homes built before 1990 may have asbestos in: - Wall sheeting (Villaboard predecessors) - Vinyl flooring backing - Cement-based products If asbestos is suspected, testing costs AUD 200 to 400. Removal by licensed specialists adds AUD 1,000 to 3,000 depending on quantity. ## Comparison: DIY vs Professional Bathroom Demolition | Factor | DIY | Professional | |---|---|---| | Tool hire | AUD 150 to 350 | Included | | Skip bin | AUD 350 to 500 | Included | | Time investment | 3 to 5 days | 1 to 2 days | | Final substrate | Often poor | Trade-ready | | Insurance | None | Public liability + workers comp | | Plumbing/electrical isolation | Must hire trades | Coordinated | | Health risk | High silica exposure | Managed | | Total real cost | AUD 800 to 1,500 plus your time | AUD 1,500 to 4,500 | DIY can save AUD 700 to 2,000 if you have time and physical ability. For most homeowners the time saved makes professional removal worthwhile. ## How to Get an Accurate Quote Provide your contractor with: 1. Photos of all four walls, floor and ceiling 2. Bathroom dimensions 3. Tile type if known 4. Property type (house, townhouse, apartment) 5. Floor level and access details 6. Build year (for asbestos risk assessment) 7. Whether plumbing and electrical have been disconnected Most Gold Coast and Brisbane strip out companies provide free quotes from photos within 24 hours. ## Hidden Costs to Watch For Reputable contractors include all of these in the upfront quote. Less reputable ones surprise you with: - Skip bin fees - Disposal levies - Grinding charges - Wall lining removal as extra - Travel charges for outer suburbs - Asbestos testing if quoted unsigted Always confirm "fixed-scope" or "all-inclusive" before booking. ## Get a Free Itemised Quote Strip It Out provides itemised, fixed-scope bathroom demolition quotes across the Gold Coast and Brisbane. Send photos and dimensions for a same-day quote. Call 0430 030 633 or use our online enquiry form. --- ### How Do You Remove Tile? The Surgical Method for Fast Results URL: https://stripitout.com.au/blog/how-do-you-remove-tile *Category: guide | Published: 5 May 2026* Professional tile removal uses electric chipping hammers with dust shrouds. A bathroom takes 4 hours; a full house takes 2 to 3 days. Here's how. Professional tile removal takes 4 hours for a bathroom and 2 to 3 days for a full house using electric chipping hammers with dust shrouds, HEPA vacuums and diamond grinders. The "surgical method" works systematically: assess the substrate, set up dust containment, work in 1-square-metre sections, lift tiles and bedding together, then grind the substrate flat. DIY hand-tool removal of the same area takes 5 to 10 times longer and damages the substrate. ## The 7-Step Surgical Tile Removal Method ### Step 1: Substrate Assessment Identify what is underneath: - Concrete slab: ideal for grinding - Cement sheet (Villaboard, Hardies): can be reused if undamaged - Plywood: usually replaced - Tile-on-tile: removable in layers - Mortar bed: requires extra grinding time The substrate determines tooling and timeline. ### Step 2: Containment Setup Seal the work area: ![Blue plastic sheeting laid over a floor during tile removal](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955138/tile_removal_floor_containment_c7912a68b1.jpg#w=1050&h=1400 "Plastic sheeting down before the first tile comes up, so dust and debris stay contained.") 1. Plastic sheeting on doorways 2. Tape around all penetrations 3. Floor protection in adjacent rooms 4. HVAC vents covered 5. Furniture and belongings removed or covered ### Step 3: Equipment Connection Connect dust extraction to every tool: - Electric chipping hammer with dust shroud - Angle grinder with shroud (for edges) - Diamond grinder with extraction port - HEPA-filtered industrial vacuum ### Step 4: Section-by-Section Removal Work in 1-square-metre sections, starting from a wall: ![Tiles lifted from a floor in sections with broken tile stacked nearby](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955139/tile_removal_section_by_section_3659cbac16.jpg#w=1400&h=788 "We lift tile section by section and stack the broken pieces as we move across the floor.") 1. Position chipping hammer at 30-degree angle 2. Strike edge of tile to crack bond 3. Lift tile and bedding together 4. Place in skip bin or wheelbarrow 5. Continue across the section Do not attempt to lift entire tiles intact. Cracking is normal and removes the bedding faster. ### Step 5: Bedding Removal Once tiles are up, the bedding layer (cement-based mortar) must also be removed. This is where DIY removals fail. Professional crews use: - Ride-on scrapers for large areas - Diamond grinders for stubborn bedding - Chipping hammers for thin layers ### Step 6: Substrate Grinding Diamond grind the substrate to remove residual adhesive and level high spots. Surface profile should be CSP-1 to CSP-3 depending on new flooring requirements. Our guide to [removing tile adhesive from concrete](/blog/how-to-remove-tile-adhesive-from-concrete) covers this step in more detail. ### Step 7: Final Vacuum HEPA vacuum the entire area twice. The substrate should be visibly clean and dust-free before the next trade arrives. ## Timeline by Project Size | Project | Area | Duration | |---|---|---| | Small ensuite | 4 sqm | 2 to 3 hours | | Standard bathroom | 8 sqm | 4 to 5 hours | | Kitchen floor | 10 sqm | 4 to 6 hours | | Hallway and one room | 20 sqm | 6 to 8 hours | | Open plan living | 40 sqm | 1 to 1.5 days | | Full house tiled floors | 80 sqm | 2 to 3 days | ## Comparison: DIY vs Professional Method | Factor | DIY Hand Tools | Professional Surgical | |---|---|---| | Bathroom (8 sqm) | 12 to 20 hours | 4 to 5 hours | | Tools needed | Hammer, chisel, scraper | Chipping hammer, grinder, vacuum | | Dust generated | Massive | Contained at source | | Substrate finish | Often unusable | Tile-ready flat | | Risk of injury | High (tile shrapnel) | Low (PPE included) | | Asbestos risk | Unknown handling | Identified and managed | ## What Affects Tile Removal Cost Pricing factors: - Area in square metres - Tile type (porcelain harder than ceramic) - Bedding thickness (thicker mortar takes longer) - Substrate type - Access (lift access in apartments adds time) - Disposal volume - Concrete grinding extent Typical Gold Coast and Brisbane prices: AUD 30 to 80 per square metre including bedding removal and substrate prep. ## Why Choose Professional Tile Removal Strip It Out delivers the surgical method on every Gold Coast and Brisbane tile removal project. Our crews use Hilti TE chipping hammers, Bosch diamond grinders and Pullman HEPA vacuums. Bathrooms are typically completed in 4 hours with substrate ready for the waterproofer the next day. We lift timber, vinyl and carpet too, so see our [floor removal](/services/floor-removal) services if more than one floor is coming up. Call 0430 030 633 for a free quote. --- ### How to Remove Mould from Carpet: Why Full Strip-Out Is Essential URL: https://stripitout.com.au/blog/how-to-remove-mould-from-carpet *Category: guide | Published: 5 May 2026* Surface mould treatment fails because mould grows into carpet backing and subfloor. The only effective solution is a full strip-out. Here's what to do. Mould-affected carpet cannot be saved by surface cleaning alone. Mould grows into the carpet backing, underlay and subfloor, releasing spores that cause respiratory illness. The only effective solution is full carpet strip-out, underlay disposal, subfloor remediation, and new flooring installation. Attempting to clean mould-contaminated carpet with bleach, vinegar or steam-cleaning fails because the spores remain embedded in fibres and underlay. ## Why Surface Cleaning Fails Mould is a fungal growth that produces microscopic spores. When mould affects carpet: 1. Spores embed in carpet fibres at the base 2. Mould grows down into foam underlay 3. Spores penetrate timber or concrete subfloor 4. Visible cleaning only removes surface growth 5. Roots regrow within days Surface treatments like vinegar, baking soda or commercial cleaners may temporarily kill visible mould but leave the underlying contamination intact. ## Health Risks of Mould-Contaminated Carpet Mould exposure causes: - Respiratory irritation and chronic coughing - Allergic reactions and asthma triggers - Sinus infections - Skin irritation - Worsening of existing respiratory conditions Children, elderly residents and people with compromised immune systems are at highest risk. ## The Correct Removal Process Full mould remediation requires: ### Step 1: Containment Seal off the affected room with plastic sheeting and tape. Set up negative pressure ventilation to prevent spore migration. ### Step 2: Carpet Removal Cut the carpet into manageable strips. Roll inward to trap spores. Bag and seal in heavy-duty plastic. ### Step 3: Underlay Removal Underlay holds the most mould. Remove all underlay. Do not attempt to reuse. ### Step 4: Subfloor Inspection Check the subfloor for mould penetration: - Concrete: clean with antimicrobial solution and dry thoroughly - Timber: may need replacement boards if rotten - Plywood: assess for delamination and replace as needed ### Step 5: Disposal Bag all contaminated material in heavy-duty plastic. Dispose at a licensed waste facility. Do not put in regular kerbside bins. ### Step 6: Drying Run dehumidifiers and air movers for 48 to 72 hours before installing new flooring. Moisture content should be below 16 percent for timber and below 4 percent for concrete. ### Step 7: Source Identification Mould requires moisture. Identify and fix the moisture source: - Roof leaks - Failed waterproofing - Plumbing leaks - Poor ventilation - Rising damp Without fixing the source, new flooring will mould again. ## Comparison: Cleaning vs Full Strip-Out | Approach | Effectiveness | Health Risk | Cost (50 sqm) | Lifespan | |---|---|---|---|---| | Surface cleaning | Temporary | High (spores remain) | AUD 200 to 500 | Weeks | | Steam cleaning | Adds moisture (worsens problem) | High | AUD 300 to 800 | Days | | Carpet replacement only | Partial | Medium (underlay/subfloor stays) | AUD 1,500 to 3,000 | Months | | Full strip-out and remediation | Complete | None if done correctly | AUD 2,000 to 5,000 | Years | ## When to Call a Professional Always call professionals if: - Mould covers more than 1 square metre - Mould has been present for over 6 months - Anyone in the household has respiratory illness - The subfloor is timber or particleboard - You suspect rising damp or hidden water damage ## Strip It Out Mould Carpet Removal Strip It Out provides carpet removal and subfloor preparation across the Gold Coast and Brisbane. We remove mould-affected carpet, underlay and contaminated material with proper containment and disposal. We coordinate with mould remediation specialists when subfloor treatment is needed. Call 0430 030 633 for a free quote. --- ### How to Remove Paint from Concrete: Grinding vs Chemicals URL: https://stripitout.com.au/blog/how-to-remove-paint-from-concrete *Category: guide | Published: 5 May 2026* Diamond grinding removes paint from concrete in a single pass; chemical strippers take multiple coats and produce hazardous waste. Which method to use. Diamond grinding is the fastest, cleanest and safest method to remove paint from concrete. It strips floor paint, epoxy and polyurethane coatings in a single pass without chemicals, leaving a substrate ready for new flooring. Chemical strippers work for thin paint layers on small areas but require multiple applications, produce hazardous waste, and leave residue that resists new coatings. For garage floors, warehouse floors, and commercial spaces over 10 square metres, professional diamond grinding is the right choice. ## When to Use Diamond Grinding Diamond grinding is the preferred method for: 1. Garage floors and warehouse floors 2. Industrial concrete with thick epoxy or polyurethane coatings 3. Commercial spaces preparing for new flooring 4. Multi-layer paint accumulated over decades 5. Areas larger than 10 square metres Professional crews complete a typical garage in 4 to 6 hours. ## When Chemical Strippers Make Sense Chemical strippers can work for: - Tiny areas under 1 square metre - Thin single-layer paint on outdoor concrete - Vertical surfaces grinders cannot reach - Decorative concrete where surface texture must be preserved Even in these cases, mechanical removal often follows chemical softening. ## Comparison: Grinding vs Chemicals | Factor | Diamond Grinding | Chemical Stripping | |---|---|---| | Speed | 50 to 80 sqm per hour | 5 to 10 sqm per hour per coat | | Coats needed | One pass | 2 to 4 applications | | Cost per sqm | AUD 25 to 60 | AUD 30 to 80 plus labour | | Hazardous waste | None | Significant | | Final substrate | Smooth, profile-ready | Often residue-stained | | Indoor safety | HEPA extracted, contained | Toxic fumes, ventilation required | | Multi-layer paint | Removes all in one pass | Each layer needs treatment | ## The Diamond Grinding Process A professional [concrete grinding](/services/concrete-grinding) service follows these steps: 1. Site inspection and equipment selection 2. Dust extraction and HEPA vacuum setup 3. Edge grinding with handheld tools 4. Floor area grinding with walk-behind or ride-on machines 5. Vacuum and inspection 6. Surface profile testing for new coating compatibility The grinder uses progressive diamond segment grits (16 to 30 to 60 to 120) to achieve the desired surface profile. The result is a clean, level concrete surface ready for new floor coatings, tiles or polish. ## Safety Considerations Concrete grinding releases respirable silica dust. Professional crews use: 1. Dust extraction connected to grinders 2. HEPA-filtered industrial vacuums 3. P2 or P3 respirators 4. Sealed containment for indoor work Australian WHS regulations limit silica exposure to 0.05 mg per cubic metre over 8 hours. DIY grinding without these controls is dangerous and illegal in commercial settings. ## DIY Grinder Hire vs Professional Service You can hire a walk-behind grinder for AUD 200 to 400 per day, but consider: - Without dust extraction, you spread silica dust through your home - Diamond segments cost extra (AUD 100 to 300 per set) - Most hire grinders lack HEPA vacuums - Achieving an even profile requires experience - Final surface often needs professional finishing For a typical garage, professional service costs slightly more than DIY but delivers a coatings-ready surface in half the time with full dust safety. ## What to Look for in a Concrete Grinding Service Ask any contractor: 1. Do you use HEPA-filtered dust extraction? 2. What surface profile (CSP) do you achieve? 3. Is the substrate ready for new coatings or floor finishes? 4. Do you handle waste disposal? 5. How long until the surface can be coated? ## Get a Free Quote Strip It Out provides professional concrete grinding and [paint removal](/services/paint-epoxy-removal) across the Gold Coast and Brisbane. Our diamond grinding equipment removes paint, epoxy and adhesive in a single pass with full HEPA dust extraction. Call 0430 030 633 for a free no-obligation quote. --- ### Silicosis Dust: What You Need to Know URL: https://stripitout.com.au/blog/silicosis-dust-what-you-need-to-know *Category: safety | Published: 13 April 2026* Silicosis is a serious lung disease caused by breathing in silica dust during construction work. Understanding the risks is essential. Silicosis is an irreversible lung disease caused by inhaling crystalline silica dust released during demolition, [tile removal](/services/tile-removal), [concrete grinding](/services/concrete-grinding) and stone cutting. Once silicosis develops, it cannot be cured. Australian workplace health and safety regulations limit silica exposure to 0.05 mg per cubic metre over 8 hours. Professional Gold Coast and Brisbane strip out companies prevent silicosis through HEPA extraction, dust shrouds, wet cutting and P2 or P3 respirators on every job. ## What Is Silicosis Silicosis occurs when fine particles of crystalline silica are inhaled deep into the lungs. The body cannot expel these particles, so they cause permanent scarring and inflammation. Three forms exist: 1. Acute silicosis: develops within weeks of heavy exposure 2. Accelerated silicosis: develops within 5 to 10 years 3. Chronic silicosis: develops after 10 to 20 years of exposure All three are progressive and incurable. In severe cases, silicosis is fatal. ## Where Silica Dust Is Released Silica is found in many common building materials: - Concrete, mortar and render - Ceramic and porcelain tiles - Engineered stone benchtops (highest silica content) - Bricks and sandstone - Plaster and gypsum Any cutting, grinding or chipping of these materials releases respirable silica dust. ## High-Risk Activities in Strip Out Work The most dangerous tasks during demolition and strip out include: 1. Tile removal (floor and wall) 2. Concrete grinding and surface preparation 3. Cutting through concrete or masonry walls 4. Engineered stone benchtop demolition (highest risk) 5. Removing rendered surfaces 6. Brick cutting and mortar removal ## Australian Regulations In Queensland, Safe Work Australia and Workplace Health and Safety Queensland set strict limits: - Workplace exposure standard: 0.05 mg per cubic metre over 8 hours - Engineered stone ban: from 1 July 2024, manufacturing, supply and installation of engineered stone benchtops, panels and slabs is prohibited (Australian Government) - Silica health monitoring is mandatory for at-risk workers ## Comparison: Standard vs Silica-Safe Demolition | Control | Standard Approach | Silica-Safe Approach | |---|---|---| | Dust extraction | None | Connected to every tool | | Vacuum | Shop vac (releases fine dust) | HEPA filtered industrial | | Wet cutting | No | Yes, where practical | | Containment | Open work area | Sealed barriers, negative pressure | | Worker PPE | Paper or no mask | P2 or P3 fitted respirator | | Health monitoring | None | Mandatory for at-risk workers | ## What Your Strip Out Company Should Do Reputable contractors implement these controls on every job: 1. Use dust extraction equipment on grinders, saws and chipping hammers 2. Use HEPA-filtered industrial vacuums for cleanup 3. Provide fitted P2 or P3 respirators to all workers 4. Use wet cutting where the surface allows 5. Set up containment barriers to prevent dust spreading 6. Train all workers in silica awareness 7. Conduct health monitoring as required by Queensland WHS ## What Homeowners Can Do If you are having strip out work done in your home: 1. Ask the contractor about dust control methods before booking 2. Ensure the work area is sealed from the rest of your home 3. Keep children, pets and elderly family members out of the work zone 4. Avoid entering the work area during dusty operations 5. Verify the contractor uses HEPA vacuums (not regular shop vacs) ## Why Choose Strip It Out Every Strip It Out team member is trained in silica safety. We use dust extraction and HEPA filtration on every project across the Gold Coast and Brisbane. Our equipment includes Bosch chipping hammers with dust shrouds, Husqvarna grinders with integrated extraction, and HEPA-filtered industrial vacuums. Worker safety and your safety are non-negotiable. Call 0430 030 633 for a free quote with full safety practices documented. --- ### Vinyl Flooring Removal: How a Professional Can Save You Time and Money URL: https://stripitout.com.au/blog/vinyl-flooring-removal-professional *Category: tips | Published: 13 April 2026* Vinyl flooring adhesive is notoriously difficult to remove. Discover why hiring a pro is usually the smarter and cheaper choice. Professional vinyl flooring removal saves homeowners 20 to 40 hours of manual labour and produces a clean concrete substrate ready for new flooring. DIY vinyl removal is notoriously slow because the adhesive bonds permanently to concrete and requires industrial scrapers and diamond grinders to remove cleanly. A typical residential vinyl removal takes professionals 4 to 8 hours; the same job takes a homeowner 2 to 5 weekends. ## Why Vinyl Adhesive Is So Hard to Remove Vinyl flooring is attached to the subfloor with adhesives that are designed to be permanent. Common challenges include: 1. Multiple layers of vinyl installed over decades, each with its own adhesive layer 2. Black bitumen adhesive in homes built before 1990 (often contains asbestos) 3. Pressure-sensitive adhesives that re-bond after partial scraping 4. Adhesive residue that resists chemical removal 5. Subfloor damage from incorrect prying Most homeowners give up after one weekend of failed scraping and call a professional anyway. ## DIY Failure Pattern The typical DIY vinyl removal goes like this: 1. Lift the visible vinyl sheet (this part is easy) 2. Discover thick adhesive layer underneath 3. Try scraping with a hand tool, make minimal progress 4. Hire a heat gun, adhesive softens but sticks to everything 5. Try chemical removers, fumes are toxic and results poor 6. Three weekends later, call a professional ## Professional Removal Process A professional vinyl removal service uses: 1. Ride-on floor scrapers that strip vinyl and adhesive in one pass at 50 to 100 square metres per hour 2. Diamond grinders to remove remaining adhesive residue 3. Dust extraction connected to all equipment 4. HEPA vacuums for final cleanup 5. Disposal in skip bins Most residential jobs are completed in 4 to 8 hours, including subfloor preparation. ## Cost Comparison: DIY vs Professional | Factor | DIY | Professional | |---|---|---| | Tool hire (scraper, heat gun) | AUD 150 to 350 | Included | | Disposal | AUD 200 to 400 | Included | | Time investment | 20 to 40 hours | 4 to 8 hours | | Subfloor finish quality | Patchy, often re-needs grinding | Tile-ready flat | | Labour stress | High | None | | Total dollar cost | AUD 350 to 750 | AUD 600 to 1,800 | When you factor in the value of your weekends, professional removal is usually comparable or cheaper. ## Asbestos Risk in Older Vinyl Floors Vinyl flooring installed before 1990 may contain asbestos fibres in either the backing or the adhesive. Common asbestos indicators: - Black tar-like adhesive (cutback adhesive) - 9-inch by 9-inch tile pattern - Vinyl asbestos tiles (VAT) If your home was built before 1990 and has vinyl flooring, get an asbestos test before any removal. Strip It Out coordinates licensed asbestos assessors and removalists when needed. ## Carpet Removal Bonus If you are removing both vinyl and carpet, professional crews can handle both in the same visit. Carpet is faster (1 to 2 hours per room) but still benefits from professional disposal and gripper strip removal. Our [vinyl and carpet removal](/services/vinyl-carpet-removal) service covers both, including the underlay and gripper strips. ## What to Look for in a Vinyl Removal Service Ask any contractor: 1. Do you use ride-on scrapers or hand tools? 2. Is concrete grinding included for residual adhesive? 3. Is waste disposal included? 4. Do you handle asbestos vinyl if discovered? 5. What is the expected timeline? ## Get a Free Quote Strip It Out provides professional vinyl, linoleum and carpet removal across the Gold Coast and Brisbane. Most residential jobs are completed in a single day with substrate ready for new flooring. For tile, timber and other floor types, see our [floor removal](/services/floor-removal) services. Call 0430 030 633 for a free quote. --- ### Step-by-Step Guide to Low-Dust Tile Removal URL: https://stripitout.com.au/blog/step-by-step-guide-to-low-dust-tile-removal-what-you-need-to-know *Category: guide | Published: 13 April 2026* Tile removal generates enormous amounts of dust. Learn about the low-dust methods professionals use to keep your space safe and clean. Low-dust [tile removal](/services/tile-removal) uses HEPA-filtered extraction equipment, dust shrouds on chipping tools, and sealed containment to keep silica dust contained at the source. Professional Gold Coast and Brisbane crews achieve dust levels under 0.05 mg per cubic metre (the WHS exposure limit) using this 7-step process: site assessment, area preparation, equipment setup, tile removal, bedding removal, concrete grinding, and final cleanup. ## Why Low-Dust Methods Matter Tile removal generates massive amounts of silica dust without proper controls. Silica is found in concrete, tiles, mortar and grout. Inhaling silica causes silicosis, an irreversible lung disease. Queensland WHS regulations set the silica exposure limit at 0.05 mg per cubic metre over 8 hours. Low-dust methods protect: - Workers performing the removal - Building occupants in nearby rooms - HVAC systems from contamination - Furniture, electronics and finishes from dust spread ## The 7-Step Low-Dust Tile Removal Process ### Step 1: Site Assessment Before work begins, the contractor assesses: - Type and thickness of tiles - Substrate type (concrete slab, cement sheet, plywood) - Adhesive or bedding method used - Access for equipment and waste - Whether adjacent areas need protection ### Step 2: Area Preparation The work zone is sealed off: 1. Plastic sheeting and tape isolate the work area 2. Door seals prevent dust migrating to other rooms 3. Floor protection covers adjacent surfaces 4. Furniture and belongings are moved or covered ### Step 3: Equipment Setup Low-dust removal relies on specialised tools: 1. Electric chipping hammers with dust shrouds 2. Diamond grinders with integrated dust extraction 3. HEPA-filtered vacuum systems (99.97 percent particle capture) 4. Dust extractors connected directly to tools ### Step 4: Tile Removal Tiles are systematically lifted using electric chipping hammers. The operator works methodically across the floor or wall. Dust extraction runs continuously. ![Tile being lifted on a terrace with a floor machine set up](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955134/terrace_tile_removal_75eafb3a3b.jpg#w=1400&h=1050 "Lifting tile on a terrace, with our machine and extraction set up on site.") ### Step 5: Bedding and Adhesive Removal Once tiles are up, the cement bedding or adhesive layer must also be removed. Diamond grinders smooth the substrate to a level finish. Our guide to [removing tile adhesive from concrete](/blog/how-to-remove-tile-adhesive-from-concrete) compares scraping, chemicals and grinding. ### Step 6: Concrete Grinding If the substrate has high spots, ridges or stubborn adhesive, diamond grinding levels the surface. This step is critical for new tiling, vinyl or timber to lay flat and bond properly. ![Floor grinder with a dust extraction hose on a prepared concrete floor](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955135/concrete_grinder_extraction_95790325ab.jpg#w=787&h=1400 "Our grinder connected to dust extraction as it works across the concrete slab.") ### Step 7: Final Cleanup The area is thoroughly vacuumed with HEPA-filtered equipment. All debris is removed from the site, leaving the substrate clean and trade-ready. ## Comparison: Standard vs Low-Dust Removal | Factor | Standard | Low-Dust | |---|---|---| | Dust extraction | None | Connected to all tools | | Vacuum filtration | Shop vac | HEPA filtered industrial | | Containment | Open air | Sealed plastic barriers | | Dust spread to home | Heavy | Minimal | | WHS compliance | Often not | Fully compliant | | Cleanup time | Days | Hours | ## Equipment Used in Professional Low-Dust Removal - Bosch GBH or Hilti TE chipping hammers with dust extraction - Lavina, Husqvarna or Hilti diamond grinders - Dustcontrol or Pullman HEPA vacuums - DPS Australia M-Class extractors - Tyvek suits and P3 respirators ## Why Choose Strip It Out Strip It Out uses professional low-dust tile removal equipment on every Gold Coast and Brisbane project. Our team is silica safety trained, our equipment is HEPA filtered, and our substrate is always trade-ready. Call 0430 030 633 for a free quote. --- ### Wood Floor Removal: Why a Professional Floor Stripper is Essential URL: https://stripitout.com.au/blog/wood-floor-removal-professional *Category: guide | Published: 13 April 2026* Timber and bamboo floors are bonded with some of the toughest adhesives in the industry. Here's why DIY removal rarely works out. Timber and bamboo floor removal requires professional ride-on scrapers and diamond grinders because the adhesive is industrial-strength and bonds permanently to concrete. Attempting DIY removal usually damages the subfloor, leaves stubborn adhesive residue, and takes 5 to 10 times longer than professional crews. A typical residential job is completed in 1 day with proper equipment versus a full week with hand tools. ## Why Timber Floor Removal Is So Difficult Timber and bamboo flooring is bonded to the subfloor with industrial adhesives designed to hold for decades. Common challenges include: 1. Multi-layer floors where one floor was installed over another 2. Aged adhesive that has hardened over 10 to 20 years 3. Tongue and groove engineering that resists prying 4. Subfloor damage during incorrect chiselling 5. Fine wood splinters that contaminate other rooms Without professional equipment, removal typically takes 8 to 12 hours per 10 square metres, with poor finish quality. ## What Professional Removal Involves A professional [timber floor removal](/services/wooden-bamboo-floor-removal) team uses: 1. Ride-on floor scrapers that lift planks and adhesive in one pass at 50 to 100 square metres per hour 2. Diamond grinders to remove remaining adhesive residue from concrete 3. HEPA-filtered industrial vacuums for cleanup 4. Dust shrouds and extraction on all cutting equipment 5. Skip bins for waste disposal The result is a clean, level concrete substrate ready for new flooring within 1 day for most homes. ## Comparison: DIY vs Professional Timber Floor Removal | Aspect | DIY | Professional | |---|---|---| | Time for 50 sqm | 3 to 5 days | 1 day | | Equipment cost | AUD 200 to 500 hire | Included in quote | | Cleanliness | Heavy dust, splinters everywhere | Contained, HEPA vacuumed | | Subfloor damage risk | High | Minimal | | Adhesive removal | Often incomplete | Fully ground flat | | Final substrate | Patchy, often unusable for tiling | Tile or new floor ready | ## Bamboo Floor Removal Specifics Bamboo flooring presents the same challenges as timber, often with worse splintering. Bamboo adhesives are particularly tenacious. Professional removal is even more important here because bamboo can fragment into sharp shards during DIY attempts. ## Subfloor Preparation After Removal Once the timber or bamboo is up, the subfloor still needs preparation. Diamond grinding removes the adhesive layer to create a smooth, flat surface. On a concrete slab this is called [concrete grinding](/services/concrete-grinding). Without this step, your new flooring (whether tiles, vinyl or new timber) will not lay flat or bond properly. ## What to Look for in a Timber Floor Removal Service Ask any contractor these questions: 1. Do you use ride-on scrapers or hand tools? 2. Do you grind the substrate flat after removal? 3. Is dust extraction included? 4. How long will my space be unusable? 5. What is included in the disposal cost? If they answer "hand tools only" or do not include grinding, look elsewhere. ## Get a Free Quote Strip It Out specialises in timber and bamboo floor removal across the Gold Coast and Brisbane using ride-on scrapers and diamond grinders. We complete most residential jobs in a single day. For tile, vinyl and carpet, see our [floor removal](/services/floor-removal) services. Call 0430 030 633 for a free quote. --- ### Why Good Communication & Reliability Matter When Choosing a Strip Out Company URL: https://stripitout.com.au/blog/communication-reliability-strip-out-company *Category: industry | Published: 13 April 2026* Why good communication and reliability matter when choosing a strip out company on the Gold Coast and Brisbane. What to look for before you book. Communication and reliability matter more than price when choosing a strip out company. Poor communication leads to delayed renovation timelines, surprise costs, and lost commercial lease deadlines. Reputable Gold Coast and Brisbane strip out companies respond to enquiries within 24 hours, provide written fixed-scope quotes, give realistic timelines, update you proactively, and remain reachable throughout the project. ## What Happens When Communication Breaks Down When a strip out company communicates poorly, the consequences cascade: 1. Your tiler, plumber and other trades cannot start on time 2. Your renovation budget grows due to extended labour costs 3. Commercial lease handover deadlines slip, triggering penalty clauses 4. Disputes arise about scope and pricing 5. Trust breaks down and the project becomes stressful For commercial defits and lease make-goods, missed handover dates can cost thousands in extended rent or lost bond. ## What Good Communication Looks Like A reliable strip out company will: 1. Return calls or enquiries within 24 hours 2. Provide a clear written quote detailing what is included and excluded 3. Give you a realistic start date and stick to it 4. Update you proactively if anything changes 5. Be reachable during the project by phone or text 6. Notify you immediately if hidden issues arise (asbestos, structural damage, hidden plumbing) 7. Provide before-and-after documentation ## Red Flags to Watch For Be cautious if a contractor: - Takes more than 48 hours to respond to your enquiry - Provides only a vague verbal quote - Cannot give you a firm start date - Has no online reviews or refuses to provide references - Will not show insurance or licence documentation - Pressures you to pay a large deposit without contract ## Comparison: Reliable vs Unreliable Contractor | Criterion | Reliable | Unreliable | |---|---|---| | Quote response time | Under 24 hours | Over 48 hours or never | | Written scope | Itemised, signed | Verbal only | | Start date | Confirmed | Vague | | Mid-project updates | Daily or as needed | Silent | | Issue notification | Immediate, with options | Found out from invoice | | Insurance proof | Provided on request | Refused or evasive | ## How Strip It Out Approaches Communication At Strip It Out, communication is one of our four core values: 1. We respond to every enquiry within 24 hours 2. Our quotes are detailed, itemised and transparent 3. We confirm a start date and stick to it 4. We provide updates daily during projects 5. If we discover unexpected issues, we stop, explain options, and get your sign-off before proceeding 6. We are reachable directly throughout the project Our 5.0 Google rating across 27 reviews reflects this approach. ## What to Ask Before Hiring Before booking any strip out contractor: 1. How quickly can you provide a written quote? 2. What is your typical lead time? 3. Can I see two or three recent references? 4. Will you carry full public liability and workers compensation insurance? 5. How will you communicate during the project? 6. What is your policy if hidden issues are discovered? ## The Bottom Line The cheapest quote rarely wins when reliability matters. Choose a strip out company that communicates clearly, follows through on commitments, and treats your project with the importance it deserves. For Gold Coast and Brisbane projects, call Strip It Out on 0430 030 633. --- ### How to Save Money on Kitchen Removal Costs URL: https://stripitout.com.au/blog/how-to-save-money-on-kitchen-removal-costs *Category: tips | Published: 13 April 2026* Renovating your kitchen is one of the best ways to add value to your home. But the costs can add up fast. Here's how to keep demolition costs in check. Kitchen demolition costs on the Gold Coast and Brisbane typically range from AUD 800 to AUD 2,500 for a standard residential kitchen. Final pricing depends on size, materials, access, and whether flooring removal is included. To save money: get multiple itemised quotes, do simple prep work yourself, bundle multiple rooms into one job, and avoid scope creep by deciding everything in advance. ## What Drives Kitchen Demolition Cost Several factors influence the price: - Size of the kitchen in linear metres of cabinetry - Materials being removed (heavy stone benchtops cost more time than laminate) - Splashback type (tiled splashbacks add complexity) - Whether flooring beneath the kitchen is also being removed - Access (single storey vs walk-up apartment) - Volume of waste and skip bin requirements - Wall removal if reconfiguring the layout ## How to Save on Kitchen Demolition ### 1. Get Itemised Quotes from Multiple Contractors A single line-item quote of "AUD 1,800" tells you nothing. Ask for: - Price for cabinetry removal - Price for benchtop removal - Price for splashback and tile removal - Price for flooring removal - Skip bin and disposal cost - Final clean-up This lets you compare apples to apples and identify what each contractor includes. Our [kitchen strip out](/services/kitchen-demolition) quotes are itemised the same way. ### 2. Do Simple Prep Work Yourself You can save several hundred dollars by handling these tasks before the team arrives: 1. Empty all cabinets and drawers 2. Remove freestanding appliances (fridge, microwave, dishwasher if not plumbed) 3. Take photos for insurance 4. Disconnect appliance plugs (but never gas or hard-wired electrics) Do not attempt plumbing, gas or electrical disconnection yourself. These need licensed tradespeople for safety and insurance reasons. ### 3. Bundle Multiple Rooms If you are renovating more than one space, ask for a package price. Most contractors discount when combining a kitchen with a bathroom or full strip out. ### 4. Avoid Scope Creep Decide everything before work begins: - Is the splashback being removed? - Is the flooring beneath the kitchen included? - Are wall linings staying or being removed? - Are any non-structural walls being taken out? Adding items mid-project costs more than including them in the original quote. ## Comparison: DIY vs Professional Kitchen Demolition | Factor | DIY | Professional | |---|---|---| | Cost | AUD 200 to 500 (skip + tools) | AUD 800 to 2,500 | | Time | Full weekend or longer | Single day | | Cleanliness | High dust spread, manual cleanup | HEPA vacuumed, dust controlled | | Risk | Damage to plumbing, gas, structure | Insured, licensed | | Skill needed | Moderate to high | Specialist | DIY can save AUD 500 to 1,500 if you have the time and physical ability. For most homeowners, professional removal is faster, safer and the time saved is worth the cost. ## Hidden Costs to Watch For - Asbestos discovery: pre-1990 homes may have asbestos in vinyl flooring or wall sheeting, which requires licensed removalists - Termite or water damage discovered during demolition - Disposal of refrigerants from old fridges and freezers - Gas line capping by a licensed gas fitter A reputable contractor flags these upfront and explains the scope before invoicing. ## Get a Free Itemised Quote Strip It Out provides itemised, fixed-scope kitchen demolition quotes across the Gold Coast and Brisbane. Call 0430 030 633 or send photos for a free no-obligation quote. --- ### What to Expect from a Tile Removal Company URL: https://stripitout.com.au/blog/what-to-expect-tile-removal-company *Category: guide | Published: 13 April 2026* Planning a renovation means dealing with the old before bringing in the new. Removing tiles is often one of the toughest and messiest jobs on the list. A professional [tile removal](/services/tile-removal) company removes ceramic, porcelain, and natural stone tiles plus tile bedding and adhesive using low-dust extraction equipment, leaving a substrate ready for new flooring. Reputable Gold Coast and Brisbane tile removal companies use HEPA-filtered vacuums, dust shrouds on chipping hammers, and diamond grinding to clean residual adhesive. A typical bathroom takes half a day; a full house with tiled floors takes 2 to 3 days. ## What a Tile Removal Service Includes A complete tile removal service should cover: ![Pile of broken tile and bedding on the floor with a shovel beside it](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955132/tile_debris_pile_8b69ac417d.jpg#w=787&h=1400 "Broken tile and bedding gathered up by our team, ready to be bagged and removed.") 1. Site assessment and quote (often free, including from photos) 2. Site protection with plastic sheeting and tape 3. Dust extraction equipment connected to all chipping and grinding tools 4. Tile removal using electric chipping hammers 5. Tile bedding and adhesive removal 6. Concrete grinding to smooth the substrate 7. HEPA vacuum cleanup 8. Skip bin and waste disposal If a quote does not include all of these steps, ask why. Half-jobs leave you with adhesive residue that prevents new flooring from bonding properly. ## Low-Dust vs Standard Tile Removal | Method | Dust Level | Equipment | Best For | |---|---|---|---| | Manual hammer and chisel | Very high | Hand tools | Tiny areas only | | Standard chipping hammer | High | Electric hammer, no extraction | Outdoor work | | Low-dust professional | Minimal | Dust extraction, HEPA vacuum, sealed barriers | Indoor residential and commercial | Always hire a low-dust professional for indoor work. Silica dust from tiles and concrete is regulated as hazardous under Queensland WHS law. ## Questions to Ask Before Hiring 1. Do you use low-dust methods with HEPA filtration? 2. Are you licensed and insured? 3. Do you remove tile bedding and adhesive, not just the tiles? 4. Is concrete grinding included? 5. Do you handle waste disposal? 6. How long will my space be unusable? ## Typical Tile Removal Timeline | Area | Duration | |---|---| | Bathroom (8 sqm) | Half day | | Kitchen (10 sqm) | Half to full day | | Hallway and one room (20 sqm) | 1 day | | Full house tiled floors (80 sqm+) | 2 to 3 days | ## Why Choose Strip It Out Strip It Out delivers low-dust tile removal across the Gold Coast and Brisbane with full dust extraction, HEPA vacuums and trained crews. We remove tiles, bedding and adhesive, then grind the substrate flat. Your space is ready for new flooring the next day. Call 0430 030 633 for a free quote. --- ### Bathroom Strip Outs: The Ultimate Guide to Bathroom Floor Removal URL: https://stripitout.com.au/blog/bathroom-strip-out-ultimate-guide *Category: guide | Published: 13 April 2026* Your bathroom renovation starts with a clean slate. You need to get rid of the old before the new tiles, fixtures, or waterproofing can go in. A [bathroom strip out](/services/bathroom-demolition) is the complete removal of fixtures, tiles, tile bedding, adhesive, and specified linings to leave a clean trade-ready shell for waterproofing and tiling. Professional residential bathroom strip outs typically take 1 to 2 days on the Gold Coast and Brisbane and cost between AUD 1,500 and AUD 4,500 depending on size, materials, and access. The result is a structural shell ready for your waterproofer, plumber and tiler. ## What Gets Removed in a Complete Bathroom Strip Out A full strip out covers every non-structural element inside the bathroom: ![Stripped bathroom wall with exposed steel studs and a window](https://res.cloudinary.com/drxhzcyza/image/upload/v1791955131/stripped_bathroom_wall_framing_70fcedb2e1.jpg#w=1050&h=1400 "Wall framing left standing once our team has stripped the bathroom linings and tiles.") 1. Fixtures: vanity, toilet, shower screen, bathtub, tapware, towel rails 2. Wall tiles: removed back to the substrate (cement sheet or plasterboard) 3. Floor tiles: including tile bedding and adhesive layer 4. Wall and ceiling linings: where specified for full renovation 5. Existing waterproofing membrane: stripped so a fresh membrane can be applied 6. Subfloor preparation: concrete grinding to remove adhesive residue and level the surface The goal is a clean shell that your waterproofer can immediately apply membrane to, then your tiler can install new tiles without delays. ## Bathroom Strip Out Timeline | Bathroom Size | Typical Duration | |---|---| | Small ensuite (4 sqm) | 1 day | | Standard family bathroom (8 sqm) | 1 to 2 days | | Large bathroom with separate bath and shower (12 sqm+) | 2 days | These timelines assume professional crews with proper equipment. DIY removal of the same scope often takes a week or longer. ## What Affects Your Bathroom Strip Out Cost Pricing varies based on these factors: - Size of the bathroom in square metres - Type of tiles and bedding (heavy ceramic on thick mortar costs more time than thin vinyl) - Access (ground floor vs second storey vs apartment with lift access) - Volume of waste and skip bin requirements - Concrete grinding requirements after tile removal - Suspected asbestos in older homes (pre-1990 builds) For typical prices by bathroom size and line item, see our [bathroom demolition cost guide](/blog/bathroom-demolition-cost). ## How to Prepare for Your Bathroom Strip Out Before the team arrives: 1. Remove all toiletries, towels and personal items 2. Have a licensed plumber disconnect water and waste lines 3. Have a licensed electrician disconnect any hardwired lighting or exhaust fans 4. Clear an access path from the bathroom to the skip bin location 5. Notify neighbours if you live in an apartment or townhouse 6. Confirm a start time and expected completion with your contractor ## Why Hire a Professional Instead of DIY DIY bathroom demolition seems cost-effective until something goes wrong. Common issues include damaging the waterproofing membrane substrate, breaking pipes hidden in walls, exposing asbestos materials without proper licensing, and breathing silica dust without appropriate PPE. A professional Gold Coast or Brisbane strip out team brings the right equipment (HEPA vacuums, dust shrouds, ride-on scrapers), proper safety training, and experience handling unexpected issues. The job gets done in 1 to 2 days, fully compliant, and ready for your next trade to start the same week. Strip It Out provides bathroom strip outs across the Gold Coast and Brisbane. Call 0430 030 633 for a free quote on your bathroom renovation prep. --- ### Dust & Safety: Why It Matters for Strip Out Projects URL: https://stripitout.com.au/blog/dust-safety-strip-out-projects *Category: safety | Published: 13 April 2026* Dust management is critical for strip out safety. Learn how professionals control silica and renovation dust on Gold Coast and Brisbane projects. Dust management is the single most important safety issue on any strip out site. Tile removal, concrete grinding and plaster demolition release fine silica particles that can cause silicosis, an irreversible lung disease. Professional contractors use HEPA-filtered extraction, dust shrouds and respiratory protection on every job. Australian and Queensland safety regulations require strict dust control on demolition sites. ## What Dust Is Released During a Strip Out Several types of hazardous dust are produced during demolition and strip out work. Crystalline silica from concrete, tiles and engineered stone is the most dangerous, with the workplace exposure limit set at 0.05 mg per cubic metre over an 8-hour period (Safe Work Australia). Other hazards include lead paint dust in homes built before 1970, asbestos fibres in homes built before 1990, and general construction dust that irritates the lungs. ## How Professional Strip Out Companies Manage Dust Reputable Gold Coast and Brisbane contractors use a layered approach to dust control: 1. Dust extraction equipment connected directly to grinders, saws and chipping hammers at the source 2. HEPA-filtered industrial vacuums that capture 99.97 percent of particles down to 0.3 microns 3. Wet cutting methods where appropriate to suppress airborne dust 4. Plastic sheeting and tape to seal off the work area from the rest of the property 5. P2 respirators for all workers performing dusty operations ## Comparison: DIY vs Professional Dust Control | Aspect | DIY Tools | Professional | |---|---|---| | Vacuum filtration | Standard shop vac | HEPA filtered industrial vacuum | | Tool extraction | None | Integrated dust shrouds | | Containment | None or plastic | Sealed barriers, tape, negative pressure | | Worker PPE | Paper mask | Fitted P2 or P3 respirator | | Compliance | None | WHS regulated, documented | ## What to Look for When Hiring a Strip Out Company Ask any prospective contractor these questions before booking: 1. Do you use dust extraction on grinders and chipping tools? 2. What HEPA-rated vacuums do you use? 3. How do you contain dust to the work area? 4. What respiratory protection do your workers wear? 5. Have your team completed silica safety training? If a contractor cannot answer these confidently, hire someone else. Dust safety is regulated, not optional. ## Why It Matters Beyond Safety Beyond worker health, dust management protects your property and your renovation timeline. Excessive dust spread can damage HVAC systems, contaminate adjacent rooms, and require additional cleaning costs. For commercial defits, poor dust control can disrupt neighbouring tenants and trigger lease violations. At Strip It Out, every team member completes silica awareness training, and we deploy dust extraction and HEPA vacuums on every project across the Gold Coast and Brisbane. Call 0430 030 633 for a free quote with full details on our safety practices. --- ## Service Areas (13) ### Gold Coast URL: https://stripitout.com.au/areas/gold-coast Strip It Out Demolition is proudly based on the Gold Coast, delivering professional strip out and internal demolition services across Southport, Surfers Paradise, Broadbeach, and surrounding suburbs. As our home base, we know the Gold Coast market inside out. ## Strip Out Services on the Gold Coast The Gold Coast is home base for Strip It Out. Since 2018 we have been clearing the way for renovations and fit-outs right across the city — Southport, Surfers Paradise, Broadbeach, Main Beach, Labrador, the canal suburbs of Benowa, Bundall, Mermaid Waters and Broadbeach Waters, and the northern beaches through Runaway Bay and Paradise Point. ### The city we know best Operating from the Gold Coast since day one means we know its building stock street by street. The beachfront and near-beach suburbs are dense with high-rise and walk-up apartments where renovation is constant and body-corporate-aware planning is essential. The canal-estate suburbs — Mermaid Waters, Broadbeach Waters, Benowa, Isle of Capri — hold established waterfront homes now well into renovation age. And Southport, the Gold Coast's CBD and health precinct, anchors a steady stream of commercial work. ### Residential and commercial, all of it For homeowners we handle [bathroom](/services/bathroom-demolition) and [kitchen demolition](/services/kitchen-demolition), [tile removal](/services/tile-removal), flooring removal, concrete grinding and full [residential strip-outs](/services/residential-strip-out). For business, the Gold Coast's relentless hospitality and retail churn — Surfers Paradise, Broadbeach and Southport especially — keeps us in [commercial strip-out and defit](/services/commercial-strip-out) work, clearing cafes, restaurants, shops and offices for the next fit-out. ### Internal and non-structural demolition Our demolition work is internal and non-structural. We remove the non-structural walls, ceilings, linings, fixtures, joinery and floor coverings inside a building and leave the structural shell in place, clean and ready for the next trade. Our [internal strip out](/services/internal-strip-out) page covers the scope, the process and the Queensland rules in full. ### Commercial strip outs and shop defits For tenants, landlords and property managers we handle full [commercial strip outs](/services/commercial-strip-out) and [shop and office defits](/services/shop-office-strip-out) scoped to the make-good clause in the lease, and we work with centre management to keep the handover on time. ### Floor, tile and surface removal We lift [tile and tile bedding](/services/tile-removal), [timber and bamboo flooring](/services/wooden-bamboo-floor-removal) and [vinyl and carpet](/services/vinyl-carpet-removal), strip [paint and epoxy](/services/paint-epoxy-removal) from concrete, and [grind the slab](/services/concrete-grinding) flat for the new floor. Tile removal and grinding run with HEPA dust extraction, so the work can usually go ahead without closing down the rest of the building. ### Wall and partition removal Opening up a kitchen, a living area or an office often means taking out a wall. We remove non-structural walls and office partitions as a stand-alone job or as part of a larger strip out. Removing a load-bearing wall is structural work that needs an engineer and a builder, so we refer those jobs on. See [wall and partition removal](/services/wall-partition-removal). ### The home-base advantage Because the Gold Coast is our base, there is no travel surcharge and no waiting — local jobs get the fastest quotes and the prompt scheduling that comes with a crew already in the area every day. As a licensed, insured, family-owned team, we treat every Gold Coast property with care and leave it genuinely trade-ready. We provide free, fixed-scope written quotes for all strip-out and internal demolition work across the Gold Coast. **Suburbs:** Southport, Surfers Paradise, Broadbeach, Broadbeach Waters, Main Beach, Benowa, Bundall, Ashmore, Labrador, Biggera Waters, Runaway Bay, Mermaid Beach, Mermaid Waters, Nobby Beach, Miami, Molendinar, Parkwood, Paradise Point, Hollywell, Coombabah, Arundel, Isle of Capri, Paradise Waters, Chevron Island, Rainbow Bay ### Logan URL: https://stripitout.com.au/areas/logan Strip It Out services the entire Logan City area including Logan Central, Springwood, Beenleigh, and Browns Plains. With over 400,000 residents and major commercial centres, Logan has strong demand for professional strip out services. ## Strip Out Services in Logan Logan is one of South East Queensland's largest and fastest-growing cities, and that scale shows up directly in demolition demand. Strip It Out works across the whole of Logan City — from the commercial centres of Springwood, Underwood and Browns Plains, through the established residential belt of Woodridge, Kingston, Logan Central and Marsden, out to the rapidly expanding new-estate communities around Yarrabilba, Bethania and Holmview. ### A city of two demolition markets Logan effectively has two distinct strip-out markets, and we service both. The first is **established housing stock**. Suburbs like Woodridge, Kingston, Logan Central and Slacks Creek are full of post-war and mid-century homes, many now being renovated by owner-occupiers and investors. Homes of this age frequently have tiled wet areas laid on thick mortar beds and contain fibre-cement sheeting, so careful, dust-controlled [bathroom](/services/bathroom-demolition) and [kitchen demolition](/services/kitchen-demolition) and tile removal are exactly the jobs we are called for. The second is **commercial and industrial**. Springwood, Underwood and Browns Plains carry large retail, office and showroom precincts where tenancies change hands regularly, generating steady [commercial strip-out and defit](/services/commercial-strip-out) work. The industrial pockets around Slacks Creek and Crestmead add warehouse and factory strip-outs to the mix. ### Local knowledge across a wide city Logan's footprint is wide and its housing ages and styles vary street to street. A strip-out crew that knows the area can quote accurately and plan access — whether that is a tight Woodridge cottage block or a Browns Plains shopping-centre tenancy with after-hours requirements. As an owner-operated team, we are on Logan jobs regularly and treat every property, owner-occupied or investment, with the same care. We provide free, fixed-scope written quotes for strip-outs, internal demolition, tile and floor removal, concrete grinding and rubbish removal right across Logan, and leave every space clean and trade-ready. **Suburbs:** Underwood, Springwood, Daisy Hill, Slacks Creek, Shailer Park, Loganholme, Tanah Merah, Cornubia, Eagleby, Beenleigh, Edens Landing, Holmview, Mount Warren Park, Windaroo, Logan Central, Browns Plains, Marsden, Woodridge, Loganlea, Bethania, Kingston, Waterford West, Carbrook, Yarrabilba ### Coomera & Northern Gold Coast URL: https://stripitout.com.au/areas/coomera Covering Coomera, Pimpama, Helensvale, and Hope Island , the fastest-growing corridor in Queensland. We provide strip out and demolition services for both new developments and established properties. ## Strip Out Services in Coomera & Northern Gold Coast The Coomera to Helensvale corridor is the fastest-growing region in Queensland, and Strip It Out services it end to end — Coomera, Upper Coomera, Pimpama, Helensvale, Oxenford, and the premium waterfront communities of Hope Island and Sanctuary Cove. ### A corridor built on growth Few parts of Australia have changed as fast as this one. Pimpama and Coomera have seen explosive population growth, the Coomera Town Centre and surrounding retail have expanded rapidly, and new housing estates continue to roll out across Upper Coomera and Willow Vale. That growth drives two kinds of demolition work. The first is **renovation of the area's older stock** — the established Oxenford and Helensvale homes from earlier development waves are now at renovation age, needing [kitchen](/services/kitchen-demolition) and [bathroom strip-outs](/services/bathroom-demolition), tile removal and flooring removal. The second is **premium property work**. Hope Island and Sanctuary Cove are among the Gold Coast's most exclusive addresses, with high-end canal-front homes where owners expect a careful, low-dust, respectful strip-out rather than a rough demolition. We bring floor protection, dust extraction and a tidy finish to every job — the standard those properties require. ### Commercial growth too The corridor's rapid expansion has brought new retail, medical and office tenancies to Coomera and Helensvale, and with new fit-outs comes [commercial strip-out and defit](/services/commercial-strip-out) demand as tenancies turn over. We handle both the residential and commercial side of the corridor. Being based on the Gold Coast, Coomera and the northern suburbs are a short run for our team, which means fast quotes and prompt scheduling. We provide free, fixed-scope written quotes for strip-outs, internal demolition and rubbish removal across Coomera, Pimpama, Helensvale, Hope Island and the surrounding suburbs. **Suburbs:** Coomera, Upper Coomera, Pimpama, Helensvale, Oxenford, Hope Island, Sanctuary Cove, Willow Vale, Wongawallan, Maudsland, Cedar Creek, Kingsholme ### Robina & Varsity Lakes URL: https://stripitout.com.au/areas/robina Robina is the Gold Coast's premier retail and commercial hub, anchored by Robina Town Centre. We provide strip out services for commercial tenancies, established homes, and body corporate properties. ## Strip Out Services in Robina & Varsity Lakes Robina and Varsity Lakes sit at the commercial heart of the central Gold Coast, and Strip It Out services the whole pocket — Robina, Varsity Lakes, Merrimac, Clear Island Waters, Mudgeeraba, Reedy Creek and Bonogin. ### A major commercial hub Robina is anchored by Robina Town Centre, one of the largest shopping centres on the Gold Coast, surrounded by office parks, medical precincts, showrooms and the Robina hospital and stadium precincts. That concentration of commercial floorspace means tenancies turn over constantly, and with them comes steady [commercial strip-out and defit](/services/commercial-strip-out) and [shop and office make-good](/services/shop-office-strip-out) work. We scope these jobs to the lease and work to the centre's access and trading-hour requirements. ### Established homes hitting renovation age Robina, Varsity Lakes and Merrimac were largely developed through the 1990s and 2000s, which means a large share of the housing is now at the age where kitchens, bathrooms and flooring are due for renovation. We handle [kitchen](/services/kitchen-demolition) and [bathroom strip-outs](/services/bathroom-demolition), tile and floor removal and full internal demolition for owner-occupiers and investors across the area. Clear Island Waters adds premium waterfront homes to the mix, while Mudgeeraba and Bonogin bring larger semi-rural properties. ### Body corporate work The area has a high concentration of villa, townhouse and unit complexes. Strip-outs inside body corporate properties need planning around shared access, noise hours and common-area protection — our [body corporate strip-out](/services/body-corporate) service is set up for exactly that. Being only minutes from our Gold Coast base, Robina and Varsity Lakes get fast quotes and prompt scheduling. We provide free, fixed-scope written quotes for all residential and commercial strip-out work. **Suburbs:** Robina, Varsity Lakes, Merrimac, Clear Island Waters, Mudgeeraba, Reedy Creek, Bonogin ### Burleigh Heads & Southern Beaches URL: https://stripitout.com.au/areas/burleigh-heads Burleigh Heads is one of the Gold Coast's hottest renovation markets. From beachside hospitality venues to character homes, we deliver careful, quality strip out work throughout Burleigh, Palm Beach, and Currumbin. ## Strip Out Services in Burleigh Heads & Southern Beaches Burleigh Heads has become one of the Gold Coast's most sought-after addresses, and that desirability drives a constant renovation and fit-out market. Strip It Out services Burleigh and the southern beaches throughout — Burleigh Heads, Burleigh Waters, Palm Beach, Currumbin, Currumbin Waters, Elanora and Tallebudgera. ### A renovation hotspot Burleigh and Palm Beach in particular have gone through a dramatic transformation. Older beach houses, modest brick homes and dated walk-up units are being renovated and reimagined street by street as the area gentrifies. That makes careful, dust-controlled strip-out work — [bathroom](/services/bathroom-demolition) and [kitchen demolition](/services/kitchen-demolition), [tile removal](/services/tile-removal), flooring removal and [non-structural wall removal](/services/wall-partition-removal) to open these homes up — some of our most regular work in the region. These are high-value properties, and homeowners expect a respectful, tidy, low-dust job; that is exactly how we work. ### Beachside hospitality Burleigh's James Street precinct and the Palm Beach and Currumbin strips have become one of the Gold Coast's busiest cafe, restaurant and boutique scenes. Hospitality and retail tenancies in a precinct like this turn over regularly, generating [commercial strip-out and defit](/services/commercial-strip-out) work — clearing a venue cleanly and on schedule for the next operator. We scope to the lease and work after hours where a trading strip requires it. Being only a short run south of our Gold Coast base, Burleigh and the southern beaches get fast quotes and prompt scheduling. We provide free, fixed-scope written quotes for all residential and commercial strip-out work across the area. **Suburbs:** Burleigh Heads, Burleigh Waters, Palm Beach, Currumbin, Currumbin Waters, Currumbin Valley, Elanora, Tallebudgera, Tallebudgera Valley, Tallai ### Ormeau & Yatala URL: https://stripitout.com.au/areas/ormeau Yatala Enterprise Area is Queensland's largest industrial precinct. We specialise in warehouse strip outs, industrial floor preparation, and commercial demolition across Ormeau, Yatala, and Stapylton. ## Strip Out Services in Ormeau & Yatala The Ormeau and Yatala corridor is the industrial engine room of the Gold Coast to Brisbane region, and Strip It Out services it across both its industrial and residential sides — Ormeau, Ormeau Hills, Yatala, Stapylton, Jacobs Well and the surrounding suburbs. ### Queensland's largest industrial precinct The Yatala Enterprise Area is one of the largest zoned industrial precincts in Queensland — a vast concentration of warehouses, factories, distribution centres and showrooms taking advantage of the M1 between Brisbane and the Gold Coast. Industrial tenancies of this scale generate serious strip-out demand: racking and shelving removal, internal office demolition, floor-coating and line-marking removal, and full [warehouse and industrial strip-outs](/services/warehouse-industrial-strip-out). We also provide [concrete grinding and floor preparation](/services/concrete-grinding) — essential when an industrial slab is being readied for a new tenant or a fresh coating. Industrial strip-outs run on tight timelines and often need to be staged so part of a facility keeps operating. We plan around that and work after hours where required. ### Residential Ormeau Alongside the industrial estates, Ormeau and Ormeau Hills have grown into substantial residential communities. The estate homes here are reaching the age where kitchens, bathrooms and flooring are being updated, and we handle those [residential strip-outs](/services/residential-strip-out), tile removals and internal demolitions for local homeowners and investors. Whether it is a major warehouse decommissioning in the Yatala Enterprise Area or a kitchen strip-out in an Ormeau estate, we provide free, fixed-scope written quotes and leave every site clean and trade-ready. **Suburbs:** Ormeau, Ormeau Hills, Yatala, Jacobs Well, Stapylton, Norwell, Luscombe, Steiglitz, Alberton, Woongoolba, Gilberton ### Brisbane South URL: https://stripitout.com.au/areas/brisbane-south We service Brisbane's southern suburbs from Upper Mount Gravatt to Carindale and Sunnybank. Established residential areas and major shopping centres create strong demand for commercial and residential strip outs. ## Strip Out Services in Brisbane South Brisbane's southern suburbs form a large, established and commercially active market, and Strip It Out services the whole of it — from Upper Mount Gravatt and Carindale through Sunnybank, Holland Park, Coorparoo, Tarragindi and Wishart, out to the newer estates around Calamvale, Parkinson and Stretton. ### Major retail and commercial centres Brisbane South is anchored by some of the city's biggest retail destinations — Westfield Carindale and the Garden City precinct at Upper Mount Gravatt — surrounded by offices, showrooms and medical suites. Sunnybank, with its dense and constantly evolving retail and dining precincts, has an especially high rate of tenancy turnover. All of this drives steady [commercial strip-out and defit](/services/commercial-strip-out) and [shop and office make-good](/services/shop-office-strip-out) demand, and we scope these jobs to the lease and work to centre access and trading-hour requirements. ### Established homes, active renovation The southern suburbs are full of post-war and mid-century homes — Holland Park, Tarragindi, Coorparoo, Mount Gravatt and Salisbury are classic examples — now firmly at renovation age. We handle [kitchen](/services/kitchen-demolition) and [bathroom strip-outs](/services/bathroom-demolition), tile and floor removal and full [residential strip-outs](/services/residential-strip-out) for owner-occupiers and investors. Homes of this era often have tiled wet areas on thick mortar beds and may contain fibre-cement sheeting, so dust-controlled removal and careful handling are the standard we bring. The newer estate homes around Calamvale and Parkinson add a steady stream of updates and refreshes. We provide free, fixed-scope written quotes for residential and commercial strip-outs, internal demolition and rubbish removal right across Brisbane South. **Suburbs:** Upper Mount Gravatt, Mount Gravatt, Mount Gravatt East, Carindale, Eight Mile Plains, Rochedale, Sunnybank, Sunnybank Hills, Holland Park, Holland Park West, Wishart, Mansfield, Macgregor, Robertson, Salisbury, Tarragindi, Coopers Plains, Runcorn, Calamvale, Algester, Stretton, Parkinson, Kuraby, Mackenzie ### Brisbane URL: https://stripitout.com.au/areas/brisbane We service Brisbane from the CBD and inner city out to the southern, western and bayside suburbs. From Queen Street and Fortitude Valley to New Farm and Bulimba, we handle commercial strip outs, office defits, hospitality strip outs and kitchen, bathroom, tile and floor removal. ## Strip Out Services across Brisbane Strip It Out works right across Brisbane, from the CBD and inner city to the southern, western and bayside suburbs. We handle [internal strip outs](/services/internal-strip-out/brisbane), commercial defits and make-goods, and kitchen, bathroom, tile and floor removal, with the same free, fixed-scope written quotes we give on the Gold Coast. ### Brisbane CBD and inner city Brisbane's CBD and inner-city ring is South East Queensland's busiest commercial strip-out market, and Strip It Out travels up from the Gold Coast to service it — the city centre, Fortitude Valley, South Brisbane, West End, Newstead, Teneriffe, New Farm and the inner-east suburbs through to Bulimba and Coorparoo. #### Commercial defits and make-goods The inner city runs on commercial tenancy turnover. Offices around Queen Street, Eagle Street and Spring Hill, retail across the Valley and South Brisbane, and the dense hospitality scene in Fortitude Valley and West End all generate constant **end-of-lease defit and make-good** work. Our [commercial strip-out](/services/commercial-strip-out) and [shop and office defit](/services/shop-office-strip-out) services are built for exactly this: scoping the works to the lease's make-good clause, coordinating with building and centre management, and working after hours where a tenancy or trading neighbours require it. #### Inner-city residential The inner ring is also some of Brisbane's most valuable residential property. New Farm, Teneriffe, Bulimba and Hawthorne are full of heritage worker's cottages and converted warehouses where renovation is constant, and apartment work is common. These jobs call for careful, dust-controlled [bathroom](/services/bathroom-demolition) and kitchen strip-outs, tile removal and [non-structural wall removal](/services/wall-partition-removal) — and, in apartment buildings, body-corporate-aware planning around lifts, loading docks and noise hours. #### Urban access, handled Inner-Brisbane jobs come with urban realities — restricted parking, lift bookings, building-management sign-in, tight loading windows. We plan access before we arrive and schedule around it, so a CBD strip-out runs as cleanly as a suburban one. We provide free, fixed-scope written quotes for commercial and residential strip-outs, defits and internal demolition across Brisbane's CBD and inner suburbs. ### Brisbane South, West and Bayside Beyond the inner city, our [Brisbane South](/areas/brisbane-south) page covers the suburbs from Upper Mount Gravatt to Carindale and Sunnybank, [Brisbane West](/areas/brisbane-west) runs from Paddington and Toowong out through Indooroopilly and Kenmore to the Centenary Suburbs, and [Brisbane Bayside](/areas/brisbane-bayside) takes in Wynnum, Manly, Hemmant and Murarrie. Each page lists the suburbs we cover. For Brisbane's northern suburbs, tell us your suburb when you call and we will confirm availability. **Suburbs:** Brisbane City, South Brisbane, Woolloongabba, Fortitude Valley, West End, Kangaroo Point, New Farm, Newstead, Spring Hill, Petrie Terrace, Bowen Hills, Highgate Hill, Dutton Park, East Brisbane, Teneriffe, Hamilton, Hawthorne, Bulimba, Morningside, Norman Park, Coorparoo, Camp Hill, Cannon Hill, Greenslopes, Ascot, Albion ### Tweed Heads & Coolangatta URL: https://stripitout.com.au/areas/tweed-heads We service the border region including Tweed Heads, Coolangatta, and Banora Point. Major redevelopment activity and an aging building stock create growing demand for strip out services south of the Gold Coast. ## Strip Out Services in Tweed Heads & Coolangatta The Tweed Heads and Coolangatta border region sits immediately south of the Gold Coast, and Strip It Out services it as a core part of our area — Tweed Heads, Tweed Heads South, Banora Point, Coolangatta, Kingscliff, Casuarina and the surrounding border suburbs. We work on both sides of the Queensland/New South Wales line. ### An ageing coastal building stock The Tweed and Coolangatta have a large stock of older beachside homes, walk-up holiday units and dated commercial buildings, much of it built decades ago for a smaller coastal town. As the region gentrifies and major town-centre renewal continues, that ageing stock is steadily being renovated or redeveloped. Older buildings mean tiled wet areas on thick mortar beds, dated kitchens, and the fibre-cement sheeting common to the era — all squarely in our wheelhouse for careful, dust-controlled [bathroom demolition](/services/bathroom-demolition), [tile removal](/services/tile-removal) and full [residential strip-outs](/services/residential-strip-out). ### Coastal hospitality and commercial Coolangatta's beachfront hospitality strip and the retail of Tweed Heads see regular tenancy turnover, generating [commercial strip-out and defit](/services/commercial-strip-out) work — cafes, restaurants and shops being cleared for the next operator. We scope this work to the lease and can run after hours to suit a trading precinct. ### Cross-border, no complications A practical advantage of hiring a Gold Coast strip-out crew for Tweed work: we already operate across the border routinely, so a job in Kingscliff or Casuarina is handled with the same prompt scheduling and free, fixed-scope quoting as one in Coolangatta. We leave every site, residential or commercial, clean and trade-ready. **Suburbs:** Tweed Heads, Tweed Heads South, Tweed Heads West, Banora Point, Terranora, Coolangatta, Bilinga, Tugun, Kirra, Fingal Head, Chinderah, Kingscliff, Casuarina, Bilambil, Bilambil Heights, Stotts Creek, Cobaki, Tumbulgum, Condong ### Nerang & Gold Coast Hinterland URL: https://stripitout.com.au/areas/nerang Nerang and the Gold Coast hinterland suburbs of Carrara, Pacific Pines, and Highland Park offer established homes and commercial properties. We provide strip out services from the hinterland gateway to the M1. ## Strip Out Services in Nerang & Gold Coast Hinterland Nerang is the gateway between the Gold Coast's coastal strip and its hinterland, and Strip It Out services the whole area — Nerang, Carrara, Highland Park, Pacific Pines, Gaven, Gilston, Worongary and out into the hinterland suburbs of Mount Nathan, Advancetown and Springbrook. ### Established estates at renovation age The Nerang corridor is one of the Gold Coast's established family-home belts. Pacific Pines and Highland Park were built out largely through the 1990s and 2000s, and a large share of those homes are now at the point where kitchens, bathrooms and flooring need replacing. That makes [kitchen](/services/kitchen-demolition) and [bathroom strip-outs](/services/bathroom-demolition), [tile removal](/services/tile-removal) and full [residential strip-outs](/services/residential-strip-out) our most regular work here — for owner-occupiers updating the family home and investors refreshing rentals. ### Commercial, industrial and acreage Nerang itself has long-established commercial and light-industrial pockets, and the Carrara precinct — home to the stadium and the well-known Carrara Markets — adds further commercial and retail floorspace. Tenancy turnover across these areas generates [commercial strip-out and defit](/services/commercial-strip-out) work. Out in the hinterland, Mount Nathan, Gilston and Advancetown bring larger acreage properties, where renovations and strip-outs come with their own access considerations — something a local crew plans for in advance. With Nerang only a short drive from our Gold Coast base, the area gets fast quotes and prompt scheduling. We provide free, fixed-scope written quotes for all residential and commercial strip-out and internal demolition work across Nerang and the hinterland. **Suburbs:** Nerang, Carrara, Highland Park, Pacific Pines, Gaven, Gilston, Mount Nathan, Worongary, Advancetown, Numinbah Valley, Natural Bridge, Springbrook ### Tweed Coast URL: https://stripitout.com.au/areas/tweed-coast Strip It Out services the entire Tweed Coast strip from the QLD/NSW border south to Cabarita Beach. Includes Pottsville, Kingscliff, Hastings Point and the major new Kings Forest and Cobaki Lakes developments. NSW-licensed for cross-border work. ## Strip Out Services on the Tweed Coast The Tweed Coast is a fast-growing residential and tourism corridor immediately south of the Gold Coast. Our team services the entire strip from the QLD/NSW border at Coolangatta down to Cabarita Beach, covering more than 25 kilometres of coastal communities. Strip It Out is fully licensed to operate across the NSW border and complies with SafeWork NSW asbestos and silica regulations on every Tweed Coast project. ### Residential Renovations Along the Tweed Coast Pottsville, Cabarita Beach and Kingscliff are some of the most active renovation markets in northern NSW. Older beachside homes, holiday rentals and townhouse complexes turn over constantly, and most projects start with a full strip out before new bathrooms, kitchens or flooring go in. We handle kitchen and bathroom strip outs, full home gut-outs, and tile and floor removal across the Tweed Coast with the same equipment and process we use throughout the Gold Coast. ### Major New Developments The Tweed Coast is undergoing significant residential expansion. Kings Forest at Cudgera Creek has approval for approximately 4,500 new dwellings, and Cobaki Lakes near the QLD border has approval for around 5,500. As display homes turn into completed estates, demand for fitout removals, kitchen swaps and tenancy strip outs in these areas will increase rapidly. We are positioned to support these new communities from day one. ### Hospitality and Small Commercial The Tweed Coast tourism economy supports a healthy mix of cafes, surf retailers, holiday accommodation and small office spaces. End-of-lease defits and shop strip outs are a regular part of our schedule, particularly around Casuarina Town Centre and the Salt Village area. We deliver fixed-scope quotes, work to your lease wording and complete most small commercial strip outs in 1 to 3 days. ### Cross-Border Considerations NSW and QLD have similar but not identical asbestos handling rules. Strip It Out is licensed for both jurisdictions and follows SafeWork NSW Code of Practice on Tweed Coast projects, with all bonded asbestos disposed of through licensed NSW transport and tip facilities. Older homes in Pottsville and Kingscliff frequently contain bonded asbestos in eaves, wet area linings or vinyl backing, so we test and quote appropriately on every job. ### Why Choose a Local Team Being based on the Gold Coast means our crews can be on site within 25 to 35 minutes of leaving our depot. We service the Tweed Coast every week and know the access conditions, council waste rules and tip locations. We are open 7 days for site visits and free quotes. Call 0430 030 633 for a free, fixed-scope quote on your Tweed Coast strip out project. **Suburbs:** Cabarita Beach, Bogangar, Hastings Point, Wooyung, Pottsville, Pottsville Beach, Round Mountain, Tanglewood, Duranbah, Cudgen, Kings Forest, Cobaki Lakes ### Brisbane Bayside URL: https://stripitout.com.au/areas/brisbane-bayside Strip It Out services Brisbane's eastern Moreton Bay strip including Wynnum, Manly, Lota, Hemmant and Tingalpa. Older character homes and active port-adjacent commercial corridors keep demand strong year-round. ## Strip Out Services in Brisbane Bayside Brisbane Bayside is the residential and light-industrial strip running along Moreton Bay from Wynnum and Manly northward through Hemmant, Murarrie and Lytton. It is a distinct market from inner Brisbane, with older housing stock, established renovation activity and a strong commercial corridor anchored by the Port of Brisbane. Our team services the entire Bayside region as a regular part of our weekly Brisbane schedule. ### Older Housing Stock and Renovation Demand Wynnum, Manly and the surrounding Bayside suburbs were largely developed between the 1920s and 1970s. Post-war workers' cottages, weatherboard character homes and brick veneer family houses dominate the streetscape, and many are now being renovated, extended or fully gutted by new owners. Bathroom and kitchen strip outs are our most common Bayside job, often combined with timber floor removal and concrete grinding to prepare slabs for new flooring. ### Bayside Lifestyle Suburbs Manly, with its yacht squadron and marina, is one of Brisbane's most desirable bayside suburbs. Wynnum esplanade, Lota foreshore and the Wynnum North Road retail strip all see steady residential and small commercial turnover. Strip It Out delivers full residential strip outs, partial demolition and surface preparation across these suburbs, including body corporate apartment work where access and noise restrictions apply. ### Commercial and Port-Adjacent Industrial Hemmant, Lytton and Murarrie form one of Brisbane's most concentrated industrial corridors. Logistics warehouses, refining and chemical facilities, container yards and light manufacturing tenancies turn over regularly, particularly as long-term leases end and new tenants take over. We handle warehouse strip outs, racking removal, internal office demolition and floor coating stripping across the port-adjacent zone, with experience working around active 24-hour operations. ### Older Character Homes in Belmont and Balmoral Belmont, Chandler, Gumdale and Balmoral on the western edge of Bayside contain large numbers of pre-war character homes. These often require careful strip out work because internal walls, ceilings or floors may contain bonded asbestos that needs to be tested and removed under controlled conditions. Strip It Out is fully licensed for friable and non-friable asbestos removal, with all waste disposed at SafeWork QLD-approved facilities. ### Travel and Coordination Bayside is approximately 70 to 80 kilometres from our Gold Coast base via the M1 and Gateway Motorway. We mobilise crews and equipment efficiently for Brisbane work and typically schedule full days on site to maximise productivity. For larger projects we can arrange overnight crew accommodation to keep timelines tight. ### Why Choose Strip It Out for Bayside We service Brisbane every week, know the access constraints around the port and bay, and work with property managers, body corporates and commercial landlords across the corridor. Free fixed-scope quotes, fully licensed and insured, available 7 days. Call 0430 030 633 for a free quote on your Brisbane Bayside strip out project. **Suburbs:** Wynnum, Wynnum West, Manly, Manly West, Lota, Hemmant, Tingalpa, Wakerley, Murarrie, Ransome, Chandler, Belmont, Gumdale, Balmoral, Lytton ### Brisbane West URL: https://stripitout.com.au/areas/brisbane-west Strip It Out services Brisbane's entire western corridor from the inner-west character belt of Paddington and Toowong out through Indooroopilly, Kenmore and the Centenary Suburbs to Westlake. Older housing stock and active renovation demand keep us in the area weekly. ## Strip Out Services in Brisbane West Brisbane's western suburbs form one of the city's most established residential corridors, stretching from the inner-west character belt of Paddington, Bardon and Toowong out through the Mid-West to the Centenary Suburbs along the Brisbane River. Strip It Out services the entire western corridor, with bathroom and kitchen renovations and full-home strip outs across the region's predominantly older housing stock. ### Inner-West Character Homes Auchenflower, Bardon, Milton, Paddington, Red Hill, St Lucia and Toowong contain some of Brisbane's most renovation-active streetscapes. The area is dominated by Queenslander cottages, post-war workers' homes and 1960s to 1970s brick veneers, all of which require careful strip out work. Heritage and character-overlay zones are common in Paddington and Red Hill, so structural elements like timber frames and original cornices are preserved during demolition where required. We test for asbestos in any home built before 1990 and coordinate with builders and architects on heritage-sensitive strip outs. Timber floor removal in older Inner-West homes often involves layers of bonded adhesive that need professional ride-on scraping and substrate grinding. ### Mid-West Family Suburbs The Mid-West corridor — Ashgrove, Chapel Hill, Fig Tree Pocket, Indooroopilly, Kenmore, Kenmore Hills, Taringa and The Gap — is dominated by larger family homes on bigger blocks. Many are 1970s and 1980s brick homes now undergoing major kitchen, bathroom and full-home renovations. The Gap and Kenmore Hills in particular have a very active renovation market driven by upgrade demand from established residents. Our most common Mid-West job is the full kitchen plus bathroom plus flooring strip out as part of a whole-home refresh, typically 3 to 5 days on site with HEPA dust extraction and floor protection in place. ### The Centenary Suburbs Jamboree Heights, Jindalee, Middle Park, Mount Ommaney, Riverhills, Seventeen Mile Rocks, Sinnamon Park and Westlake make up Brisbane's Centenary Suburbs along the western reach of the Brisbane River. Originally developed in the 1970s as part of the Centenary master plan, these suburbs are now seeing widespread renovation activity as the original homes reach their first or second renovation cycle. We service the entire Centenary corridor with full residential strip outs, kitchen and bathroom demolitions and concrete grinding for new floor preparation, with consistent access to large blocks and double-driveway worksites. ### Travel and Coordination Brisbane West is approximately 80 to 90 kilometres from our Gold Coast base via the M1, Gateway Motorway and Western Freeway. We schedule full days on site and mobilise the right equipment for each job, whether that is HEPA extraction for tile removal or ride-on scrapers for timber floor lift-outs. Free fixed-scope quotes, fully licensed and insured, available 7 days. Call 0430 030 633 for a free quote on your Brisbane West strip out project. **Suburbs:** Auchenflower, Bardon, Milton, Paddington, Red Hill, St Lucia, Toowong, Ashgrove, Chapel Hill, Fig Tree Pocket, Indooroopilly, Kenmore, Kenmore Hills, Taringa, The Gap, Jamboree Heights, Jindalee, Middle Park, Mount Ommaney, Riverhills, Seventeen Mile Rocks, Sinnamon Park, Westlake ## Contact - Phone: 0430 030 633 - Email: info@stripitout.com.au - Address: Gold Coast, QLD, Australia - Hours: Monday - Sunday, 6:00 AM - 5:00 PM ## Social Media - facebook: https://www.facebook.com/share/1L1axTKYXA/ - instagram: https://www.instagram.com/strip_it_out_demolition/ - youtube: https://www.youtube.com/@StripItOutDemolition - x: https://x.com/StripItOut - tiktok: https://www.tiktok.com/@stripitout - linkedin: https://www.linkedin.com/in/strip-it-out-26a6213a9